Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,969
matching recommendationsSIC | 201 | Meat Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0699 # 03 Y:2000 | 03 | 2000 | ISOLATE HOT OR COLD EQUIPMENT | $37,855 | $0 | n/a |
GT0699 # 04 Y:2000 | 04 | 2000 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,198 | $1,000 | n/a |
GT0699 # 05 Y:2000 | 05 | 2000 | INSULATE BARE EQUIPMENT | $5,763 | $3,000 | n/a |
GT0699 # 06 Y:2000 | 06 | 2000 | MINIMIZE WATER USAGE | $680 | $600 | n/a |
GT0699 # 07 Y:2000 | 07 | 2000 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $883 | $9,000 | n/a |
GT0699 # 08 Y:2000 | 08 | 2000 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $505 | $900 | n/a |
GT0699 # 09 Y:2000 | 09 | 2000 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $11,182 | $31,500 | n/a |
GT0699 # 10 Y:2000 | 10 | 2000 | COMBINE UTILITY METERS | $21,948 | $0 | n/a |
GT0699 # 11 Y:2000 | 11 | 2000 | MINIMIZE WATER USAGE | $207 | $205 | n/a |
CO0469 # 01 Y:2000 | 01 | 2000 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $3,000 | $9,500 | Implemented |
CO0469 # 02 Y:2000 | 02 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $860 | $2,270 | Not Implemented |
CO0469 # 03 Y:2000 | 03 | 2000 | INSULATE BARE EQUIPMENT | $590 | $1,510 | Implemented |
CO0469 # 04 Y:2000 | 04 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $350 | $0 | Implemented |
CO0469 # 05 Y:2000 | 05 | 2000 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $730 | $50 | Implemented |
CO0469 # 06 Y:2000 | 06 | 2000 | AUTOMATE FINISHING PROCESS | $27,300 | $20,000 | Not Implemented |
CO0469 # 07 Y:2000 | 07 | 2000 | INSTALL AUTOMATIC PACKING EQUIPMENT | $22,100 | $9,000 | Implemented |
CO0469 # 08 Y:2000 | 08 | 2000 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $2,080 | $1,200 | Implemented |
IA0248 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,434 | $13,248 | Implemented |
IA0248 # 02 Y:2000 | 02 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,780 | $0 | Implemented |
IA0248 # 03 Y:2000 | 03 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $641 | $0 | Not Implemented |
IA0248 # 04 Y:2000 | 04 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $604 | $125 | Implemented |
OD0162 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,184 | $2,257 | Not Implemented |
OD0162 # 02 Y:2000 | 02 | 2000 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $1,775 | $1,870 | Not Implemented |
UF0251 # 01 Y:2000 | 01 | 2000 | REPAIR AND ELIMINATE STEAM LEAKS | $786 | $440 | Implemented |
UF0251 # 02 Y:2000 | 02 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $228 | $228 | Implemented |