IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

186

matching recommendations
Reset
SIC 201 Meat Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0087 # 11 Y:1996 11 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,059 $5,330 Implemented
SF0087 # 12 Y:1996 12 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,369 $4,210 Implemented
SF0087 # 13 Y:1996 13 1996 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $8,603 $1,329 Not Implemented
SF0087 # 14 Y:1996 14 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $868 $1,375 Not Implemented
SF0087 # 15 Y:1996 15 1996 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $3,998 $3,435 Implemented
SF0087 # 16 Y:1996 16 1996 METER WASTE WATER $2,085 $4,500 Not Implemented
SF0074 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,480 $1,158 Not Implemented
SF0074 # 02 Y:1995 02 1995 INSTALL SPECTRAL REFLECTORS / DELAMP $8,747 $5,369 Not Implemented
SF0074 # 03 Y:1995 03 1995 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,044 $262 Implemented
SF0074 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $272 $600 Not Implemented
SF0074 # 05 Y:1995 05 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $648 $0 Implemented
SF0074 # 06 Y:1995 06 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $685 $75 Not Implemented
SF0074 # 07 Y:1995 07 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,143 $2,542 Not Implemented
SF0074 # 08 Y:1995 08 1995 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,174 $150 Implemented
SF0074 # 09 Y:1995 09 1995 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $387 $25 Implemented
SF0074 # 10 Y:1995 10 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $554 $0 Implemented
NV0024 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $25,839 $0 Implemented
NV0024 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,322 $246 Implemented
NV0024 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $977 $3,381 Not Implemented
NV0024 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $731 $200 Implemented
NV0024 # 05 Y:1995 05 1995 INSULATE BARE EQUIPMENT $170 $83 Not Implemented
NV0024 # 06 Y:1995 06 1995 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $1,366 $200 Implemented
NV0024 # 07 Y:1995 07 1995 OPTIMIZE PLANT POWER FACTOR $659 $2,700 Implemented
SD0062 # 01 Y:1993 01 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,044 $950 Implemented
SD0062 # 02 Y:1993 02 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,350 $0 Implemented