Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,939
matching recommendationsSIC | 201 | Meat Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0390 # 04 Y:1989 | 04 | 1989 | INSTALL / REPAIR INSULATION ON STEAM LINES | $423 | $210 | Implemented |
GT0390 # 05 Y:1989 | 05 | 1989 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $219 | $350 | Implemented |
GT0390 # 06 Y:1989 | 06 | 1989 | USE COLD WASTE WATER TO COOL CHILLER FEED WATER | $14,480 | $16,950 | Not Implemented |
GT0390 # 07 Y:1989 | 07 | 1989 | RECOVER WASTE HEAT FROM EQUIPMENT | $68,230 | $29,500 | Implemented |
GT0390 # 08 Y:1989 | 08 | 1989 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $14,700 | $0 | Implemented |
GT0392 # 01 Y:1989 | 01 | 1989 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,550 | $0 | Implemented |
GT0392 # 02 Y:1989 | 02 | 1989 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,803 | $2,217 | Implemented |
GT0392 # 03 Y:1989 | 03 | 1989 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,625 | $0 | Implemented |
GT0392 # 04 Y:1989 | 04 | 1989 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $650 | $0 | Not Implemented |
GT0392 # 05 Y:1989 | 05 | 1989 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,680 | $2,110 | Implemented |
GT0392 # 06 Y:1989 | 06 | 1989 | REPAIR AND ELIMINATE STEAM LEAKS | $3,490 | $375 | Implemented |
GT0392 # 07 Y:1989 | 07 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,120 | $1,220 | Implemented |
GT0392 # 08 Y:1989 | 08 | 1989 | USE OPTIMUM THICKNESS INSULATION | $14,830 | $22,000 | Not Implemented |
GT0392 # 09 Y:1989 | 09 | 1989 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $41,430 | $16,000 | Implemented |
GT0392 # 10 Y:1989 | 10 | 1989 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,490 | $27,500 | Not Implemented |
GT0392 # 11 Y:1989 | 11 | 1989 | USE OPTIMUM THICKNESS INSULATION | $740 | $1,190 | Not Implemented |
GT0392 # 12 Y:1989 | 12 | 1989 | REDUCE OR ELIMINATE WASTE | $24,430 | $0 | Implemented |
KU0295 # 01 Y:1989 | 01 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $390 | $576 | Implemented |
KU0295 # 02 Y:1989 | 02 | 1989 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,793 | $3,300 | Implemented |
KU0295 # 03 Y:1989 | 03 | 1989 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,741 | $5,300 | Implemented |
KU0295 # 04 Y:1989 | 04 | 1989 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $1,301 | $150 | Implemented |
KU0295 # 05 Y:1989 | 05 | 1989 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,066 | $0 | Implemented |
KU0295 # 06 Y:1989 | 06 | 1989 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $238 | $200 | Not Implemented |
KU0295 # 07 Y:1989 | 07 | 1989 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $120 | $200 | Not Implemented |
KU0295 # 08 Y:1989 | 08 | 1989 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,182 | $500 | Implemented |