IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

43

matching recommendations
Reset
SIC 201 Meat Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0390 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,625 $24,932 Not Implemented
MS0390 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,662 $51,336 Not Implemented
MS0390 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,384 $351 Not Implemented
MS0325 # 07 Y:2008 07 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $318 $1,050 Implemented
MS0325 # 06 Y:2008 06 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $411 $1,800 Implemented
MS0325 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,471 $24,719 Implemented
MS0325 # 02 Y:2008 02 2008 REPAIR AND ELIMINATE STEAM LEAKS $9,208 $156 Implemented
MS0325 # 03 Y:2008 03 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,992 $8,100 Not Implemented
MS0325 # 04 Y:2008 04 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,031 $7,308 Not Implemented
MS0325 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,772 $236 Not Implemented
MS0303 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $42,224 $161,070 Implemented
MS0303 # 02 Y:2006 02 2006 HEAT WATER WITH EXHAUST HEAT $9,180 $27,946 Not Implemented
MS0303 # 03 Y:2006 03 2006 BURN WASTE OIL FOR HEAT $3,804 $2,186 Implemented
MS0303 # 04 Y:2006 04 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,457 $1,500 Implemented
MS0293 # 09 Y:2006 09 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $133 $233 Not Implemented
MS0293 # 08 Y:2006 08 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $235 $62 Not Implemented
MS0293 # 07 Y:2006 07 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $351 $210 Not Implemented
MS0293 # 06 Y:2006 06 2006 INSULATE BARE EQUIPMENT $421 $55 Not Implemented
MS0293 # 05 Y:2006 05 2006 BURN WASTE OIL FOR HEAT $564 $3,595 Not Implemented
MS0293 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,168 $7,343 Not Implemented
MS0293 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,307 $2,895 Not Implemented
MS0293 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,385 $176 Not Implemented
MS0293 # 01 Y:2006 01 2006 INSULATE BARE EQUIPMENT $3,933 $670 Not Implemented
MS0125 # 04 Y:1998 04 1998 ELIMINATE/REDUCE AN OPERATION $3,255 $0 Implemented
MS0125 # 03 Y:1998 03 1998 INSTALL TIMERS AND/OR THERMOSTATS $125 $236 Implemented