Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
87
matching recommendationsSIC | 201 | Meat Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0639 # 05 Y:2019 | 05 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,235 | $31,057 | Not Implemented |
NC0639 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $18,727 | $25,000 | Not Implemented |
NC0639 # 03 Y:2019 | 03 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $49,700 | $125,000 | Not Implemented |
NC0639 # 02 Y:2019 | 02 | 2019 | INCREASE AMOUNT OF CONDENSATE RETURNED | $4,196 | $8,200 | Not Implemented |
NC0639 # 06 Y:2019 | 06 | 2019 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $103,705 | $500 | Not Implemented |
NC0639 # 01 Y:2019 | 01 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,819 | $1,000 | Not Implemented |
NC0596 # 04 Y:2017 | 04 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $30,012 | $39,000 | Not Implemented |
NC0596 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,879 | $54,333 | Not Implemented |
NC0596 # 02 Y:2017 | 02 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,718 | $100 | Implemented |
NC0596 # 03 Y:2017 | 03 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $41,579 | $200,000 | Not Implemented |
NC0596 # 05 Y:2017 | 05 | 2017 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $18,342 | $85,000 | Not Implemented |
NC0507 # 03 Y:2014 | 03 | 2014 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $51,724 | $62,000 | Not Implemented |
NC0507 # 06 Y:2014 | 06 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $264 | $50 | Implemented |
NC0507 # 05 Y:2014 | 05 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $806 | $650 | Not Implemented |
NC0507 # 07 Y:2014 | 07 | 2014 | INSTALL OCCUPANCY SENSORS | $1,828 | $1,018 | Not Implemented |
NC0507 # 04 Y:2014 | 04 | 2014 | KEEP BOILER TUBES CLEAN | $6,811 | $2,000 | Implemented |
NC0507 # 02 Y:2014 | 02 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $16,846 | $43,969 | Not Implemented |
NC0507 # 01 Y:2014 | 01 | 2014 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $13,167 | $23,000 | Not Implemented |
NC0507 # 09 Y:2014 | 09 | 2014 | DEVELOP A REPAIR/REPLACE POLICY | $2,801 | $10,912 | Implemented |
NC0507 # 08 Y:2014 | 08 | 2014 | USE PHOTOCELL CONTROLS | $72 | $80 | Not Implemented |
NC0362 # 03 Y:2007 | 03 | 2007 | DEVELOP A REPAIR/REPLACE POLICY | $3,512 | $3,546 | Not Implemented |
NC0362 # 02 Y:2007 | 02 | 2007 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $75,775 | $79,525 | Not Implemented |
NC0362 # 05 Y:2007 | 05 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $295 | $537 | Not Implemented |
NC0362 # 01 Y:2007 | 01 | 2007 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $43,646 | $70,525 | Not Implemented |
NC0362 # 04 Y:2007 | 04 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,160 | $50 | Not Implemented |