IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

47

matching recommendations
Reset
SIC 201 Meat Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0601 # 09 Y:2017 09 2017 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $2,876 $30 Not Implemented
NC0601 # 08 Y:2017 08 2017 INSTALL OCCUPANCY SENSORS $217 $487 Not Implemented
NC0601 # 07 Y:2017 07 2017 ADOPT IN-HOUSE MATERIAL GENERATION $21,773 $20,000 Not Implemented
NC0601 # 06 Y:2017 06 2017 RECOVER WASTE HEAT FROM EQUIPMENT $15,825 $82,000 Not Implemented
NC0601 # 05 Y:2017 05 2017 INSULATE FEEDWATER TANK $792 $750 Not Implemented
NC0601 # 04 Y:2017 04 2017 KEEP BOILER TUBES CLEAN $2,408 $1,000 Implemented
NC0601 # 03 Y:2017 03 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,606 $100 Not Implemented
NC0601 # 02 Y:2017 02 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,840 $750 Not Implemented
NC0601 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,641 $200 Implemented
OD0162 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,184 $2,257 Not Implemented
OD0162 # 02 Y:2000 02 2000 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $1,775 $1,870 Not Implemented
OD0155 # 02 Y:2000 02 2000 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $1,414 $1,200 Not Implemented
OD0155 # 03 Y:2000 03 2000 $450 $179 Implemented
OD0155 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,185 $26,708 Implemented
OD0152 # 03 Y:2000 03 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,598 $0 Not Implemented
OD0152 # 07 Y:2000 07 2000 REPAIR AND ELIMINATE STEAM LEAKS $2,357 $680 Not Implemented
OD0152 # 08 Y:2000 08 2000 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $452 $1,000 Not Implemented
OD0152 # 05 Y:2000 05 2000 USE SYNTHETIC LUBRICANT $478 $156 Not Implemented
OD0152 # 02 Y:2000 02 2000 INSTALL OCCUPANCY SENSORS $911 $950 Not Implemented
OD0152 # 06 Y:2000 06 2000 REPAIR OR REPLACE STEAM TRAPS $3,005 $225 Not Implemented
OD0152 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,265 $10,172 Not Implemented
OD0152 # 04 Y:2000 04 2000 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $749 $360 Not Implemented
NC0128 # 09 Y:1997 09 1997 REDUCE SCRAP PRODUCTION $1,288 $250 Not Implemented
NC0128 # 08 Y:1997 08 1997 OPERATE BOILERS ON HIGH FIRE SETTING $19,152 $2,000 Implemented
NC0128 # 07 Y:1997 07 1997 AIR CONDITION ONLY SPACE NECESSARY $3,389 $7,155 Not Implemented