IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

46

matching recommendations
Reset
SIC 201 Meat Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0097 # 02 Y:1990 02 1990 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $700 $0 Not Implemented
KU0314 # 01 Y:1990 01 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $532 $600 Implemented
KU0314 # 02 Y:1990 02 1990 INCREASE AMOUNT OF CONDENSATE RETURNED $20,739 $22,000 Implemented
KU0314 # 03 Y:1990 03 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $538 $0 Implemented
KU0314 # 04 Y:1990 04 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,014 $1,587 Implemented
KU0314 # 06 Y:1990 06 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $986 $40 Not Implemented
KU0314 # 07 Y:1990 07 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $306 $150 Implemented
KU0314 # 05 Y:1990 05 1990 RECOVER AND REUSE COOLING WATER $5,719 $2,000 Implemented
AM0097 # 01 Y:1990 01 1990 INCREASE AMOUNT OF CONDENSATE RETURNED $1,357 $0 Not Implemented
AM0097 # 03 Y:1990 03 1990 COMBINE UTILITY METERS $694 $1,100 Not Implemented
AM0097 # 04 Y:1990 04 1990 INSULATE BARE EQUIPMENT $250 $60 Implemented
AM0097 # 07 Y:1990 07 1990 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $63 $0 Implemented
AM0097 # 06 Y:1990 06 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $136 $52 Implemented
AM0097 # 05 Y:1990 05 1990 INSTALL / REPAIR INSULATION ON STEAM LINES $200 $530 Not Implemented
OR0081 # 02 Y:1990 02 1990 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $3,741 $635 Implemented
OR0081 # 01 Y:1990 01 1990 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $4,762 $68,000 Implemented
OR0081 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,690 $1,924 Not Implemented
OR0081 # 03 Y:1990 03 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,720 $10,000 Implemented
OR0081 # 05 Y:1990 05 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $137 $324 Implemented
GT0398 # 04 Y:1990 04 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $634 $0 Not Implemented
GT0397 # 07 Y:1990 07 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,690 $450 Not Implemented
GT0397 # 06 Y:1990 06 1990 REPAIR AND ELIMINATE STEAM LEAKS $2,300 $300 Not Implemented
GT0397 # 05 Y:1990 05 1990 INSTALL / REPAIR INSULATION ON STEAM LINES $390 $224 Not Implemented
GT0398 # 08 Y:1990 08 1990 ELIMINATE LEAKS IN WATER LINES AND VALVES $340 $200 Not Implemented
GT0398 # 09 Y:1990 09 1990 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $25,600 $1,500 Not Implemented