IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

140

matching recommendations
Reset
SIC 201 Meat Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0123 # 11 Y:1997 11 1997 $21,040 $11,500 Not Implemented
SF0123 # 12 Y:1997 12 1997 $54,074 $250 Not Implemented
GT0620 # 01 Y:1997 01 1997 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,454 $1,200 Not Implemented
GT0620 # 02 Y:1997 02 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $1,260 $1,870 Not Implemented
GT0620 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,270 $6,830 Implemented
GT0620 # 04 Y:1997 04 1997 USE OPTIMUM THICKNESS INSULATION $390 $900 Not Implemented
GT0620 # 05 Y:1997 05 1997 ELIMINATE LEAKS IN WATER LINES AND VALVES $55 $50 Implemented
GT0620 # 06 Y:1997 06 1997 $9,546 $50,000 Not Implemented
IA0171 # 01 Y:1997 01 1997 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $13,500 $25,100 Not Implemented
IA0171 # 02 Y:1997 02 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,701 $4,500 Not Implemented
IA0171 # 03 Y:1997 03 1997 DIRECT WARMEST AIR TO COMBUSTION INTAKE $3,600 $1,720 Not Implemented
IA0171 # 04 Y:1997 04 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,164 $1,652 Not Implemented
IA0171 # 05 Y:1997 05 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $374 $684 Not Implemented
OD0089 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $228 $8,826 Implemented
OD0089 # 02 Y:1997 02 1997 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $10,166 $12,876 Not Implemented
OD0089 # 03 Y:1997 03 1997 $1,325 $1,000 Not Implemented
GT0618 # 01 Y:1997 01 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $52,000 $2,000 Implemented
GT0618 # 02 Y:1997 02 1997 REPLACE BOILER $57,000 $100,000 Not Implemented
GT0618 # 03 Y:1997 03 1997 INSULATE BARE EQUIPMENT $3,600 $3,000 Implemented
GT0618 # 04 Y:1997 04 1997 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $149,009 $238,000 Implemented
GT0618 # 05 Y:1997 05 1997 MINIMIZE WATER USAGE $3,550 $3,450 Implemented
GT0618 # 06 Y:1997 06 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,175 $99,710 Implemented
GT0618 # 07 Y:1997 07 1997 MINIMIZE WATER USAGE $398,150 $400,000 Not Implemented
AM0301 # 01 Y:1997 01 1997 RECOVER AND REUSE WASTE MATERIAL $114,000 $3,000 Implemented
AM0301 # 02 Y:1997 02 1997 OPTIMIZE PLANT POWER FACTOR $2,930 $3,040 Implemented