Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
27
matching recommendationsSIC | 2011 | Meat Packing Plants |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0951 # 05 Y:2016 | 05 | 2016 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $5,675 | $2,816 | Implemented |
OK0951 # 04 Y:2016 | 04 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,904 | $3,000 | Implemented |
OK0440 # 07 Y:1994 | 07 | 1994 | INSULATE BARE EQUIPMENT | $214 | $258 | Implemented |
OK0440 # 06 Y:1994 | 06 | 1994 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $368 | $0 | Implemented |
OK0440 # 05 Y:1994 | 05 | 1994 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,037 | $700 | Implemented |
OK0440 # 04 Y:1994 | 04 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,522 | $5,878 | Implemented |
OK0440 # 03 Y:1994 | 03 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,930 | $16,704 | Implemented |
OK0440 # 02 Y:1994 | 02 | 1994 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $14,382 | $0 | Implemented |
OK0440 # 01 Y:1994 | 01 | 1994 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $22,747 | $25,415 | Implemented |
KU0247 # 02 Y:1988 | 02 | 1988 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,591 | $0 | Implemented |
KU0247 # 07 Y:1988 | 07 | 1988 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $390 | $705 | Implemented |
KU0247 # 05 Y:1988 | 05 | 1988 | INSTALL / REPAIR INSULATION ON STEAM LINES | $288 | $0 | Implemented |
KU0247 # 04 Y:1988 | 04 | 1988 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,305 | $0 | Implemented |
KU0247 # 03 Y:1988 | 03 | 1988 | INSTALL TURBULATORS | $1,010 | $350 | Implemented |
KU0217 # 09 Y:1987 | 09 | 1987 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,661 | $300 | Implemented |
KU0217 # 07 Y:1987 | 07 | 1987 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,186 | $4,170 | Implemented |
KU0217 # 06 Y:1987 | 06 | 1987 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $549 | $500 | Implemented |
KU0217 # 02 Y:1987 | 02 | 1987 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,162 | $0 | Implemented |
KU0172 # 05 Y:1985 | 05 | 1985 | INSTALL TIMERS AND/OR THERMOSTATS | $345 | $34 | Implemented |
KU0172 # 02 Y:1985 | 02 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,410 | $3,270 | Implemented |
KU0119 # 01 Y:1984 | 01 | 1984 | RECOVER WASTE HEAT FROM EQUIPMENT | $21,545 | $16,000 | Implemented |
KU0119 # 14 Y:1984 | 14 | 1984 | INSULATE BARE EQUIPMENT | $264 | $150 | Implemented |
KU0119 # 12 Y:1984 | 12 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $393 | $50 | Implemented |
KU0119 # 09 Y:1984 | 09 | 1984 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $982 | $200 | Implemented |
KU0119 # 08 Y:1984 | 08 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $1,240 | $0 | Implemented |