Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
785
matching recommendationsSIC | 2011 | Meat Packing Plants |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0262 # 06 Y:2004 | 06 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,093 | $0 | Not Implemented |
BD0262 # 07 Y:2004 | 07 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,261 | $850 | Implemented |
BD0262 # 08 Y:2004 | 08 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $287 | $286 | Implemented |
BD0262 # 09 Y:2004 | 09 | 2004 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $945 | $1,600 | Not Implemented |
BD0262 # 10 Y:2004 | 10 | 2004 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $603 | $90 | Not Implemented |
BD0262 # 11 Y:2004 | 11 | 2004 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $32,008 | $100 | Not Implemented |
BD0262 # 12 Y:2004 | 12 | 2004 | INSTALL AUTOMATIC PACKING EQUIPMENT | $436,800 | $99,000 | Not Implemented |
BD0262 # 13 Y:2004 | 13 | 2004 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $13,000 | $300 | Implemented |
BD0262 # 14 Y:2004 | 14 | 2004 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $11,289 | $5,500 | Implemented |
BD0262 # 15 Y:2004 | 15 | 2004 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $1,724 | $250 | Not Implemented |
BD0262 # 16 Y:2004 | 16 | 2004 | PAY BILLS ON TIME TO AVOID LATE FEES | $2,231 | $0 | Not Implemented |
BD0262 # 17 Y:2004 | 17 | 2004 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $560 | $500 | Not Implemented |
OK0687 # 01 Y:2004 | 01 | 2004 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $7,853 | $8,000 | Not Implemented |
OK0687 # 02 Y:2004 | 02 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,548 | $825 | Not Implemented |
OK0687 # 03 Y:2004 | 03 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,490 | $5,298 | Not Implemented |
OK0687 # 04 Y:2004 | 04 | 2004 | INSTALL OCCUPANCY SENSORS | $1,980 | $269 | Not Implemented |
OK0687 # 05 Y:2004 | 05 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,199 | $287 | Not Implemented |
OK0687 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,275 | $8,882 | Not Implemented |
UF0340 # 01 Y:2004 | 01 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $122,549 | $170,000 | Not Implemented |
UF0340 # 02 Y:2004 | 02 | 2004 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $617,545 | $2,420,000 | Not Implemented |
UF0340 # 03 Y:2004 | 03 | 2004 | REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE | $29,744 | $98,000 | Not Implemented |
UF0340 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $38,590 | $48,289 | Implemented |
UF0340 # 05 Y:2004 | 05 | 2004 | OPTIMIZE PLANT POWER FACTOR | $10,480 | $40,000 | Implemented |
UF0340 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,682 | $400 | Implemented |
UF0340 # 07 Y:2004 | 07 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,109 | $37,572 | Not Implemented |