Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
781
matching recommendationsSIC | 2011 | Meat Packing Plants |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0262 # 10 Y:2004 | 10 | 2004 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $603 | $90 | Not Implemented |
BD0262 # 11 Y:2004 | 11 | 2004 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $32,008 | $100 | Not Implemented |
BD0262 # 12 Y:2004 | 12 | 2004 | INSTALL AUTOMATIC PACKING EQUIPMENT | $436,800 | $99,000 | Not Implemented |
BD0262 # 13 Y:2004 | 13 | 2004 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $13,000 | $300 | Implemented |
BD0262 # 14 Y:2004 | 14 | 2004 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $11,289 | $5,500 | Implemented |
BD0262 # 15 Y:2004 | 15 | 2004 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $1,724 | $250 | Not Implemented |
BD0262 # 16 Y:2004 | 16 | 2004 | PAY BILLS ON TIME TO AVOID LATE FEES | $2,231 | $0 | Not Implemented |
BD0262 # 17 Y:2004 | 17 | 2004 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $560 | $500 | Not Implemented |
OK0687 # 01 Y:2004 | 01 | 2004 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $7,853 | $8,000 | Not Implemented |
OK0687 # 02 Y:2004 | 02 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,548 | $825 | Not Implemented |
OK0687 # 03 Y:2004 | 03 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,490 | $5,298 | Not Implemented |
OK0687 # 04 Y:2004 | 04 | 2004 | INSTALL OCCUPANCY SENSORS | $1,980 | $269 | Not Implemented |
OK0687 # 05 Y:2004 | 05 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,199 | $287 | Not Implemented |
OK0687 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,275 | $8,882 | Not Implemented |
UF0340 # 01 Y:2004 | 01 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $122,549 | $170,000 | Not Implemented |
UF0340 # 02 Y:2004 | 02 | 2004 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $617,545 | $2,420,000 | Not Implemented |
UF0340 # 03 Y:2004 | 03 | 2004 | REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE | $29,744 | $98,000 | Not Implemented |
UF0340 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $38,590 | $48,289 | Implemented |
UF0340 # 05 Y:2004 | 05 | 2004 | OPTIMIZE PLANT POWER FACTOR | $10,480 | $40,000 | Implemented |
UF0340 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,682 | $400 | Implemented |
UF0340 # 07 Y:2004 | 07 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,109 | $37,572 | Not Implemented |
UF0340 # 08 Y:2004 | 08 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,678 | $7,900 | Implemented |
IC0072 # 01 Y:2004 | 01 | 2004 | CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS | $30,046 | $118,316 | n/a |
IC0072 # 02 Y:2004 | 02 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,893 | $6,541 | n/a |
IC0072 # 03 Y:2004 | 03 | 2004 | INSTALL TIMERS AND/OR THERMOSTATS | $1,003 | $398 | n/a |