Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
32
matching recommendationsSIC | 2011 | Meat Packing Plants |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0218 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $33,997 | $8,799 | Not Implemented |
IC0218 # 02 Y:2019 | 02 | 2019 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $63,690 | $6,300 | Not Implemented |
IC0218 # 03 Y:2019 | 03 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,151 | $14,700 | Not Implemented |
IC0218 # 04 Y:2019 | 04 | 2019 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,883 | $8,244 | Not Implemented |
BD0262 # 14 Y:2004 | 14 | 2004 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $11,289 | $5,500 | Implemented |
BD0262 # 17 Y:2004 | 17 | 2004 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $560 | $500 | Not Implemented |
BD0262 # 16 Y:2004 | 16 | 2004 | PAY BILLS ON TIME TO AVOID LATE FEES | $2,231 | $0 | Not Implemented |
BD0262 # 15 Y:2004 | 15 | 2004 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $1,724 | $250 | Not Implemented |
BD0262 # 01 Y:2004 | 01 | 2004 | INSTALL TURBULATORS | $40,923 | $2,400 | Implemented |
BD0262 # 13 Y:2004 | 13 | 2004 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $13,000 | $300 | Implemented |
BD0262 # 12 Y:2004 | 12 | 2004 | INSTALL AUTOMATIC PACKING EQUIPMENT | $436,800 | $99,000 | Not Implemented |
BD0262 # 11 Y:2004 | 11 | 2004 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $32,008 | $100 | Not Implemented |
BD0262 # 10 Y:2004 | 10 | 2004 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $603 | $90 | Not Implemented |
BD0262 # 09 Y:2004 | 09 | 2004 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $945 | $1,600 | Not Implemented |
BD0262 # 08 Y:2004 | 08 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $287 | $286 | Implemented |
BD0262 # 07 Y:2004 | 07 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,261 | $850 | Implemented |
BD0262 # 06 Y:2004 | 06 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,093 | $0 | Not Implemented |
BD0262 # 05 Y:2004 | 05 | 2004 | INSTALL OCCUPANCY SENSORS | $3,267 | $1,200 | Implemented |
BD0262 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,116 | $8,920 | Implemented |
BD0262 # 03 Y:2004 | 03 | 2004 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $8,498 | $4,000 | Not Implemented |
BD0262 # 02 Y:2004 | 02 | 2004 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $12,994 | $3,000 | Implemented |
IC0072 # 02 Y:2004 | 02 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,893 | $6,541 | n/a |
IC0072 # 03 Y:2004 | 03 | 2004 | INSTALL TIMERS AND/OR THERMOSTATS | $1,003 | $398 | n/a |
IC0072 # 06 Y:2004 | 06 | 2004 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,391 | $850 | n/a |
IC0072 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,546 | $4,320 | n/a |