Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
63
matching recommendationsSIC | 2011 | Meat Packing Plants |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0302 # 05 Y:2004 | 05 | 2004 | ADJUST BURNERS FOR EFFICIENT OPERATION | $5,988 | $0 | Implemented |
NC0302 # 04 Y:2004 | 04 | 2004 | ADJUST BURNERS FOR EFFICIENT OPERATION | $372 | $0 | Implemented |
NC0302 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $953 | $100 | Implemented |
NC0302 # 02 Y:2004 | 02 | 2004 | AVOID FROST FORMATION ON EVAPORATORS | $5,926 | $19,000 | Not Implemented |
NC0302 # 01 Y:2004 | 01 | 2004 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $59,627 | $136,000 | Implemented |
IA0344 # 05 Y:2004 | 05 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $413 | $25 | Not Implemented |
IA0344 # 04 Y:2004 | 04 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $997 | $166 | Not Implemented |
IA0344 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,472 | $254 | Not Implemented |
IA0344 # 02 Y:2004 | 02 | 2004 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $1,161 | $2,300 | Not Implemented |
IA0344 # 01 Y:2004 | 01 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $6,831 | $13,500 | Not Implemented |
IA0344 # 06 Y:2004 | 06 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $913 | $857 | Not Implemented |
IA0344 # 10 Y:2004 | 10 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $252 | $630 | Not Implemented |
IA0344 # 09 Y:2004 | 09 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,065 | $4,616 | Not Implemented |
IA0344 # 08 Y:2004 | 08 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,027 | $198 | Not Implemented |
IA0344 # 07 Y:2004 | 07 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,449 | $7,025 | Not Implemented |
UF0345 # 06 Y:2004 | 06 | 2004 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $2,882 | $3,496 | Implemented |
UF0345 # 01 Y:2004 | 01 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $7,479 | $18,128 | Implemented |
UF0345 # 02 Y:2004 | 02 | 2004 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $9,242 | $24,500 | Implemented |
UF0345 # 03 Y:2004 | 03 | 2004 | ADD AREA LIGHTING SWITCHES | $2,283 | $2,910 | Implemented |
UF0345 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,734 | $8,430 | Implemented |
UF0345 # 05 Y:2004 | 05 | 2004 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $519 | $525 | Implemented |
BD0262 # 02 Y:2004 | 02 | 2004 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $12,994 | $3,000 | Implemented |
BD0262 # 10 Y:2004 | 10 | 2004 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $603 | $90 | Not Implemented |
BD0262 # 17 Y:2004 | 17 | 2004 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $560 | $500 | Not Implemented |
BD0262 # 09 Y:2004 | 09 | 2004 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $945 | $1,600 | Not Implemented |