Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
662
matching recommendationsSIC | 2013 | Sausages And Other Prepared Meats |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0508 # 01 Y:2021 | 01 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,328 | $100 | Implemented |
GT0943 # 05 Y:2020 | 05 | 2020 | INSULATE BARE EQUIPMENT | $736 | $1,938 | Implemented |
GT0943 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,306 | $3,500 | Implemented |
GT0943 # 02 Y:2020 | 02 | 2020 | INSTALL OCCUPANCY SENSORS | $4,323 | $2,678 | Implemented |
GT0943 # 01 Y:2020 | 01 | 2020 | INSTALL TIMERS AND/OR THERMOSTATS | $3,005 | $563 | Implemented |
UD1012 # 06 Y:2020 | 06 | 2020 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $67,773 | $0 | Implemented |
UD1012 # 16 Y:2020 | 16 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,160 | $0 | Implemented |
UD1012 # 15 Y:2020 | 15 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,548 | $0 | Implemented |
UD1012 # 14 Y:2020 | 14 | 2020 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $3,073 | $0 | Implemented |
UD1012 # 09 Y:2020 | 09 | 2020 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $27,338 | $0 | Implemented |
UD1012 # 07 Y:2020 | 07 | 2020 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $49,540 | $21,295 | Implemented |
UD1012 # 17 Y:2020 | 17 | 2020 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $24,810 | $35,000 | Implemented |
UD1012 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,178 | $1,000 | Implemented |
UD1008 # 01 Y:2019 | 01 | 2019 | DEVELOP A REPAIR/REPLACE POLICY | $4,386 | $0 | Implemented |
UD1008 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,191 | $0 | Implemented |
UD1008 # 11 Y:2019 | 11 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,177 | $165,000 | Implemented |
UD1008 # 05 Y:2019 | 05 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,619 | $3,650 | Implemented |
UD1008 # 02 Y:2019 | 02 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,245 | $0 | Implemented |
UD1008 # 10 Y:2019 | 10 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,896 | $500 | Implemented |
UD1007 # 08 Y:2019 | 08 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,204 | $0 | Implemented |
UD1007 # 11 Y:2019 | 11 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,235 | $23,550 | Implemented |
UD1007 # 05 Y:2019 | 05 | 2019 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $4,980 | $0 | Implemented |
MI0345 # 05 Y:2018 | 05 | 2018 | INSTALL OCCUPANCY SENSORS | $1,380 | $540 | Implemented |
MI0345 # 06 Y:2018 | 06 | 2018 | USE SOLAR HEAT TO HEAT WATER | $1,166 | $2,755 | Implemented |
MI0345 # 01 Y:2018 | 01 | 2018 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,969 | $3,100 | Implemented |