IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

61

matching recommendations
Reset
SIC 2013 Sausages And Other Prepared Meats
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0707 # 05 Y:2015 05 2015 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $8,630 $500 Implemented
CO0707 # 04 Y:2015 04 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,840 $1,420 Implemented
CO0707 # 03 Y:2015 03 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,100 $2,370 Implemented
CO0707 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,740 $480 Implemented
CO0707 # 01 Y:2015 01 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $45,850 $10,470 Implemented
CO0495 # 05 Y:2001 05 2001 REUSE / RECYCLE/ SELL PAPER PRODUCTS $9,900 $1,000 Implemented
CO0495 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $250 $0 Implemented
CO0495 # 03 Y:2001 03 2001 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $470 $500 Implemented
CO0495 # 02 Y:2001 02 2001 INSTALL OCCUPANCY SENSORS $1,860 $500 Implemented
CO0495 # 01 Y:2001 01 2001 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,590 $17,000 Implemented
CO0469 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $350 $0 Implemented
CO0469 # 05 Y:2000 05 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $730 $50 Implemented
CO0469 # 08 Y:2000 08 2000 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $2,080 $1,200 Implemented
CO0469 # 07 Y:2000 07 2000 INSTALL AUTOMATIC PACKING EQUIPMENT $22,100 $9,000 Implemented
CO0469 # 03 Y:2000 03 2000 INSULATE BARE EQUIPMENT $590 $1,510 Implemented
CO0469 # 01 Y:2000 01 2000 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $3,000 $9,500 Implemented
CO0068 # 07 Y:1986 07 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,985 $300 Implemented
CO0068 # 01 Y:1986 01 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $17,856 $700 Implemented
CO0068 # 05 Y:1986 05 1986 INSTALL / REPAIR INSULATION ON STEAM LINES $6,055 $14,709 Implemented
CO0068 # 10 Y:1986 10 1986 INCREASE AMOUNT OF CONDENSATE RETURNED $1,616 $2,600 Implemented
CO0068 # 12 Y:1986 12 1986 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $2,238 $1,800 Implemented
CO0068 # 11 Y:1986 11 1986 REPAIR AND ELIMINATE STEAM LEAKS $2,009 $600 Implemented
CO0068 # 15 Y:1986 15 1986 INSULATE BARE EQUIPMENT $471 $291 Implemented
CO0068 # 14 Y:1986 14 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,370 $1,214 Implemented
CO0067 # 05 Y:1986 05 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,899 $300 Implemented