Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,416
matching recommendationsSIC | 2013 | Sausages And Other Prepared Meats |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0506 # 04 Y:2006 | 04 | 2006 | ADD ADDITIONAL PRODUCTION SHIFT | $11,400 | $2,700 | Implemented |
OR0506 # 05 Y:2006 | 05 | 2006 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,200 | $3,600 | Implemented |
OR0506 # 06 Y:2006 | 06 | 2006 | PAY BILLS ON TIME TO AVOID LATE FEES | $2,300 | $0 | Implemented |
IA0396 # 01 Y:2006 | 01 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $781 | $25 | Not Implemented |
IA0396 # 02 Y:2006 | 02 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,228 | $600 | Implemented |
IA0396 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $302 | $3,899 | Implemented |
IA0396 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,836 | $4,661 | Implemented |
IA0396 # 05 Y:2006 | 05 | 2006 | DISCONNECT BALLASTS | $810 | $83 | Implemented |
IA0396 # 06 Y:2006 | 06 | 2006 | HEAT WATER WITH EXHAUST HEAT | $57,298 | $18,000 | Not Implemented |
IA0396 # 07 Y:2006 | 07 | 2006 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $6,338 | $500 | Implemented |
IA0396 # 08 Y:2006 | 08 | 2006 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $2,234 | $1,702 | Implemented |
IA0396 # 09 Y:2006 | 09 | 2006 | USE MINIMUM STEAM OPERATING PRESSURE | $2,109 | $25 | Not Implemented |
OK0735 # 01 Y:2006 | 01 | 2006 | REDUCE EXCESSIVE BOILER BLOWDOWN | $69,788 | $55,933 | Not Implemented |
OK0735 # 02 Y:2006 | 02 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $13,821 | $9,500 | Not Implemented |
OK0735 # 03 Y:2006 | 03 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $29,625 | $4,000 | Not Implemented |
OK0735 # 04 Y:2006 | 04 | 2006 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,193 | $12,830 | Not Implemented |
OK0735 # 05 Y:2006 | 05 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,240 | $700 | Not Implemented |
LE0238 # 01 Y:2006 | 01 | 2006 | USE SOLAR HEAT TO MAKE ELECTRICTY | $1,077,481 | $2,403,050 | Not Implemented |
LE0238 # 02 Y:2006 | 02 | 2006 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $902,617 | $540,000 | Not Implemented |
LE0238 # 03 Y:2006 | 03 | 2006 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $335,810 | $500 | Implemented |
LE0238 # 04 Y:2006 | 04 | 2006 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $124,858 | $17,600 | Not Implemented |
LE0238 # 05 Y:2006 | 05 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $16,103 | $2,500 | Implemented |
LE0238 # 06 Y:2006 | 06 | 2006 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $15,870 | $3,000 | Implemented |
LE0238 # 07 Y:2006 | 07 | 2006 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $9,609 | $45,000 | Implemented |
LE0238 # 08 Y:2006 | 08 | 2006 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $5,409 | $3,000 | Not Implemented |