IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,416

matching recommendations
Reset
SIC 2013 Sausages And Other Prepared Meats
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0117 # 05 Y:2001 05 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $5,335 $1,700 Not Implemented
GT0707 # 01 Y:2001 01 2001 KEEP BOILER TUBES CLEAN $5,290 $3,000 Not Implemented
GT0707 # 02 Y:2001 02 2001 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $6,057 $5,500 Not Implemented
GT0707 # 03 Y:2001 03 2001 REUSE / RECYCLE/ SELL PAPER PRODUCTS $2,040 $6,700 Implemented
GT0707 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,680 $3,496 Not Implemented
GT0707 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $103 $72 Implemented
GT0707 # 06 Y:2001 06 2001 REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE $7,808 $0 Implemented
GT0707 # 07 Y:2001 07 2001 MODIFY STARTUP/SHUTDOWN TIMES $45,820 $0 Implemented
GT0707 # 08 Y:2001 08 2001 INSTALL OCCUPANCY SENSORS $179 $250 Not Implemented
CO0469 # 01 Y:2000 01 2000 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $3,000 $9,500 Implemented
CO0469 # 02 Y:2000 02 2000 RECOVER WASTE HEAT FROM EQUIPMENT $860 $2,270 Not Implemented
CO0469 # 03 Y:2000 03 2000 INSULATE BARE EQUIPMENT $590 $1,510 Implemented
CO0469 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $350 $0 Implemented
CO0469 # 05 Y:2000 05 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $730 $50 Implemented
CO0469 # 06 Y:2000 06 2000 AUTOMATE FINISHING PROCESS $27,300 $20,000 Not Implemented
CO0469 # 07 Y:2000 07 2000 INSTALL AUTOMATIC PACKING EQUIPMENT $22,100 $9,000 Implemented
CO0469 # 08 Y:2000 08 2000 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $2,080 $1,200 Implemented
IA0248 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,434 $13,248 Implemented
IA0248 # 02 Y:2000 02 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,780 $0 Implemented
IA0248 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $641 $0 Not Implemented
IA0248 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $604 $125 Implemented
OD0162 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,184 $2,257 Not Implemented
OD0162 # 02 Y:2000 02 2000 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $1,775 $1,870 Not Implemented
OD0155 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,185 $26,708 Implemented
OD0155 # 02 Y:2000 02 2000 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $1,414 $1,200 Not Implemented