Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
327
matching recommendationsSIC | 2015 | Poultry Slaughtering And Processing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0072 # 12 Y:2011 | 12 | 2011 | REDUCE VENTILATION AIR | $44,740 | $4,400 | Implemented |
DL0072 # 09 Y:2011 | 09 | 2011 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $24,840 | $2,500 | Implemented |
OK0789 # 03 Y:2010 | 03 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,970 | $31,888 | Implemented |
OK0789 # 08 Y:2010 | 08 | 2010 | INSTALL / REPAIR INSULATION ON STEAM LINES | $827 | $896 | Implemented |
OK0789 # 11 Y:2010 | 11 | 2010 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $997 | $1,486 | Implemented |
OK0789 # 06 Y:2010 | 06 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,798 | $7,980 | Implemented |
SF0364 # 01 Y:2008 | 01 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,446 | $0 | Implemented |
SF0364 # 02 Y:2008 | 02 | 2008 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $4,812 | $1,046 | Implemented |
SF0364 # 03 Y:2008 | 03 | 2008 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,974 | $913 | Implemented |
SF0364 # 04 Y:2008 | 04 | 2008 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,655 | $798 | Implemented |
SF0364 # 06 Y:2008 | 06 | 2008 | BURN A LESS EXPENSIVE GRADE OF FUEL | $85,730 | $61,250 | Implemented |
SF0364 # 09 Y:2008 | 09 | 2008 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $9,060 | $11,740 | Implemented |
SF0364 # 10 Y:2008 | 10 | 2008 | REDUCE EXCESSIVE BOILER BLOWDOWN | $6,734 | $8,900 | Implemented |
SF0364 # 16 Y:2008 | 16 | 2008 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $6,581 | $35,138 | Implemented |
SF0364 # 15 Y:2008 | 15 | 2008 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $6,376 | $28,462 | Implemented |
SF0364 # 14 Y:2008 | 14 | 2008 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $63,306 | $125,074 | Implemented |
SF0364 # 13 Y:2008 | 13 | 2008 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,296 | $2,489 | Implemented |
SF0364 # 12 Y:2008 | 12 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,909 | $2,854 | Implemented |
SF0364 # 11 Y:2008 | 11 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $409 | $801 | Implemented |
GT0827 # 05 Y:2006 | 05 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,421 | $4,053 | Implemented |
GT0827 # 06 Y:2006 | 06 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,361 | $2,328 | Implemented |
GT0827 # 08 Y:2006 | 08 | 2006 | METER WASTE WATER | $81,583 | $5,250 | Implemented |
GT0827 # 09 Y:2006 | 09 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $158,948 | $150,000 | Implemented |
GT0827 # 10 Y:2006 | 10 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,887 | $3,400 | Implemented |
MS0303 # 04 Y:2006 | 04 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,457 | $1,500 | Implemented |