IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

718

matching recommendations
Reset
SIC 2015 Poultry Slaughtering And Processing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0289 # 05 Y:2002 05 2002 INSTALL OCCUPANCY SENSORS $380 $532 Not Implemented
IA0289 # 06 Y:2002 06 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,026 $0 Not Implemented
IA0289 # 07 Y:2002 07 2002 ADJUST BURNERS FOR EFFICIENT OPERATION $8,655 $1,000 Not Implemented
IA0289 # 08 Y:2002 08 2002 DIRECT WARMEST AIR TO COMBUSTION INTAKE $2,260 $2,000 Not Implemented
IA0289 # 09 Y:2002 09 2002 INSTALL AUTOMATIC PACKING EQUIPMENT $95,697 $127,000 Not Implemented
IA0289 # 10 Y:2002 10 2002 MINIMIZE WATER USAGE $308 $100 Not Implemented
GT0736 # 01 Y:2002 01 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,485 $0 Not Implemented
GT0736 # 02 Y:2002 02 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $384 $500 Implemented
GT0736 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN WATER LINES AND VALVES $33,702 $5,000 Implemented
GT0736 # 04 Y:2002 04 2002 BURN A LESS EXPENSIVE GRADE OF FUEL $38,000 $38,000 Not Implemented
GT0736 # 05 Y:2002 05 2002 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $14,344 $0 Not Implemented
GT0736 # 06 Y:2002 06 2002 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $8,300 $0 Implemented
GT0736 # 07 Y:2002 07 2002 COVER OPEN TANKS $3,121 $6,000 Not Implemented
GT0736 # 08 Y:2002 08 2002 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $44,595 $27,000 Not Implemented
GT0736 # 09 Y:2002 09 2002 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $8,580 $0 Implemented
GT0736 # 10 Y:2002 10 2002 RECOVER WASTE HEAT FROM EQUIPMENT $14,745 $31,000 Not Implemented
GT0699 # 01 Y:2000 01 2000 ELIMINATE SHIFT $244,498 $0 n/a
GT0699 # 02 Y:2000 02 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $20,694 $0 n/a
GT0699 # 03 Y:2000 03 2000 ISOLATE HOT OR COLD EQUIPMENT $37,855 $0 n/a
GT0699 # 04 Y:2000 04 2000 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,198 $1,000 n/a
GT0699 # 05 Y:2000 05 2000 INSULATE BARE EQUIPMENT $5,763 $3,000 n/a
GT0699 # 06 Y:2000 06 2000 MINIMIZE WATER USAGE $680 $600 n/a
GT0699 # 07 Y:2000 07 2000 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $883 $9,000 n/a
GT0699 # 08 Y:2000 08 2000 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $505 $900 n/a
GT0699 # 09 Y:2000 09 2000 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $11,182 $31,500 n/a