IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

97

matching recommendations
Reset
SIC 2015 Poultry Slaughtering And Processing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0341 # 01 Y:2023 01 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $18,080 $9,000 n/a
MZ0341 # 03 Y:2023 03 2023 DIRECT WARMEST AIR TO COMBUSTION INTAKE $12,536 $16,400 n/a
MZ0341 # 04 Y:2023 04 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,207 $160 n/a
MZ0341 # 02 Y:2023 02 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,839 $3,000 n/a
OK0870 # 01 Y:2013 01 2013 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $8,384 $0 Implemented
OK0870 # 04 Y:2013 04 2013 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $20,022 $105,120 Not Implemented
OK0870 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,957 $0 Implemented
OK0870 # 03 Y:2013 03 2013 DEVELOP A REPAIR/REPLACE POLICY $1,212 $2,500 Not Implemented
OK0849 # 08 Y:2013 08 2013 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $9,409 $18,800 Not Implemented
OK0849 # 10 Y:2013 10 2013 REDUCE EXCESSIVE BOILER BLOWDOWN $27,300 $18,000 Not Implemented
OK0849 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,052 $6,875 Not Implemented
OK0849 # 06 Y:2013 06 2013 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $1,100 $1,850 Not Implemented
OK0849 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,600 $4,755 Not Implemented
OK0849 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,965 $6,565 Not Implemented
OK0849 # 05 Y:2013 05 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $30,500 $24,400 Not Implemented
OK0849 # 09 Y:2013 09 2013 UPGRADE CONTROLS ON COMPRESSORS $26,916 $53,800 Not Implemented
OK0849 # 07 Y:2013 07 2013 REDUCE EXCESSIVE BOILER BLOWDOWN $18,700 $29,260 Not Implemented
OK0849 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,939 $5,800 Not Implemented
OK0833 # 08 Y:2012 08 2012 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $31,700 $0 Implemented
OK0833 # 07 Y:2012 07 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,150 $24,000 Not Implemented
OK0833 # 02 Y:2012 02 2012 INSULATE BARE EQUIPMENT $4,000 $2,000 Not Implemented
OK0833 # 09 Y:2012 09 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $460 $3,400 Implemented
OK0833 # 01 Y:2012 01 2012 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $5,700 $5,000 Implemented
OK0833 # 03 Y:2012 03 2012 INSULATE BARE EQUIPMENT $1,600 $2,500 Not Implemented
OK0833 # 04 Y:2012 04 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,000 $500 Implemented