Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,813
matching recommendationsSIC | 202 | Dairy Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0279 # 04 Y:2025 | 04 | 2025 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $8,900 | $4,720 | n/a |
UU0279 # 01 Y:2025 | 01 | 2025 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $92,200 | $14,000 | n/a |
UU0279 # 06 Y:2025 | 06 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,760 | $1,400 | n/a |
UU0279 # 05 Y:2025 | 05 | 2025 | INSULATE BARE EQUIPMENT | $1,050 | $2,860 | n/a |
UU0279 # 02 Y:2025 | 02 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $119,920 | $620,000 | n/a |
UU0279 # 07 Y:2025 | 07 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $49,660 | $460,010 | n/a |
UU0279 # 03 Y:2025 | 03 | 2025 | REPAIR AND ELIMINATE STEAM LEAKS | $5,400 | $15,580 | n/a |
DL0259 # 05 Y:2025 | 05 | 2025 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $10,050 | $40,000 | n/a |
DL0259 # 02 Y:2025 | 02 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,620 | $30,000 | n/a |
DL0259 # 03 Y:2025 | 03 | 2025 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $3,091 | $13,000 | n/a |
DL0259 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,217 | $5,500 | n/a |
DL0259 # 01 Y:2025 | 01 | 2025 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $45,458 | $19,000 | n/a |
CI0042 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $99,111 | $675,274 | n/a |
CI0042 # 05 Y:2024 | 05 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $17,797 | $90,000 | n/a |
CI0042 # 02 Y:2024 | 02 | 2024 | REPLACE BOILER | $66,255 | $50,000 | n/a |
CI0042 # 03 Y:2024 | 03 | 2024 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $44,001 | $25,000 | n/a |
CI0042 # 08 Y:2024 | 08 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,561 | $4,560 | n/a |
CI0042 # 10 Y:2024 | 10 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,862 | $6,000 | n/a |
CI0042 # 07 Y:2024 | 07 | 2024 | INSTALL OCCUPANCY SENSORS | $8,210 | $2,325 | n/a |
CI0042 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $33,610 | $14,000 | n/a |
CI0042 # 06 Y:2024 | 06 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $16,424 | $4,950 | n/a |
CI0042 # 09 Y:2024 | 09 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,050 | $6,000 | n/a |
WM0234 # 06 Y:2025 | 06 | 2025 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,418 | $0 | Not Implemented |
WM0234 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $41,369 | $5,616 | Not Implemented |
WM0234 # 04 Y:2025 | 04 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,502 | $10,895 | Not Implemented |