IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

110

matching recommendations
Reset
SIC 202 Dairy Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0656 # 01 Y:2015 01 2015 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $2,308,919 $1,300,000 Implemented
OR0656 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,591 $27,789 Implemented
OR0656 # 05 Y:2015 05 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,282 $22,500 Implemented
OR0656 # 02 Y:2015 02 2015 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $188,688 $247,000 Implemented
OR0594 # 03 Y:2012 03 2012 Install Anaerobic Digester $1,369,423 $3,468,069 Implemented
OR0594 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,684 $7,360 Implemented
OR0583 # 01 Y:2012 01 2012 AVOID FROST FORMATION ON EVAPORATORS $3,140 $2,412 Implemented
OR0583 # 05 Y:2012 05 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $1,391 $3,854 Implemented
OR0583 # 04 Y:2012 04 2012 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $6,078 $500 Implemented
OR0583 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,663 $19,592 Implemented
OR0583 # 06 Y:2012 06 2012 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $2,779 $6,600 Implemented
OR0518 # 02 Y:2007 02 2007 INSTALL OCCUPANCY SENSORS $1,020 $2,050 Implemented
OR0507 # 02 Y:2006 02 2006 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $46,800 $2,000 Implemented
OR0507 # 04 Y:2006 04 2006 KEEP BOILER TUBES CLEAN $13,700 $4,000 Implemented
OR0507 # 05 Y:2006 05 2006 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $40,000 $1,500 Implemented
OR0507 # 01 Y:2006 01 2006 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $2,600 $0 Implemented
OR0507 # 06 Y:2006 06 2006 ADD ADDITIONAL PRODUCTION SHIFT $60,100 $41,100 Implemented
OR0507 # 10 Y:2006 10 2006 INSTALL ISOLATION TRANSFORMER ON ADJUSTABLE FREQUENCY DRIVE $22,760 $24,900 Implemented
OR0507 # 15 Y:2006 15 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,890 $19,200 Implemented
OR0501 # 03 Y:2006 03 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $41,300 $59,700 Implemented
OR0501 # 07 Y:2006 07 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,100 $0 Implemented
OR0501 # 02 Y:2006 02 2006 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $72,600 $1 Implemented
OR0501 # 06 Y:2006 06 2006 INSTALL OCCUPANCY SENSORS $8,560 $100 Implemented
OR0501 # 04 Y:2006 04 2006 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $31,700 $105 Implemented
OR0501 # 01 Y:2006 01 2006 INCREASE AMOUNT OF CONDENSATE RETURNED $119,000 $200 Implemented