IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

88

matching recommendations
Reset
SIC 202 Dairy Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0818 # 04 Y:2020 04 2020 REPAIR OR REPLACE STEAM TRAPS $7,500 $1,300 Implemented
AM0818 # 05 Y:2020 05 2020 INSULATE BARE EQUIPMENT $3,170 $524 Implemented
AM0818 # 09 Y:2020 09 2020 PAY UTILITY BILLS ON TIME $256 $0 Implemented
AM0818 # 01 Y:2020 01 2020 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,029,555 $25,000 Implemented
AM0818 # 07 Y:2020 07 2020 USE PHOTOCELL CONTROLS $700 $450 Implemented
AM0818 # 10 Y:2020 10 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $160 $150 Implemented
AM0818 # 08 Y:2020 08 2020 INSTALL OCCUPANCY SENSORS $340 $550 Implemented
AM0732 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,470 $6,750 Implemented
AM0732 # 01 Y:2017 01 2017 TREAT AND REUSE RINSE WATERS $19,732 $5,800 Implemented
AM0643 # 04 Y:2013 04 2013 INSULATE BARE EQUIPMENT $1,940 $235 Implemented
AM0643 # 01 Y:2013 01 2013 INCREASE AMOUNT OF CONDENSATE RETURNED $34,060 $250,000 Implemented
AM0643 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,370 $50 Implemented
AM0643 # 06 Y:2013 06 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,960 $500 Implemented
AM0643 # 05 Y:2013 05 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,900 $500 Implemented
AM0627 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,546 $980 Implemented
AM0560 # 02 Y:2009 02 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $17,860 $25,000 Implemented
AM0560 # 09 Y:2009 09 2009 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $620 $0 Implemented
AM0560 # 08 Y:2009 08 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,495 $670 Implemented
AM0560 # 07 Y:2009 07 2009 USE SYNTHETIC LUBRICANT $2,715 $0 Implemented
AM0560 # 06 Y:2009 06 2009 INSULATE BARE EQUIPMENT $10,970 $2,190 Implemented
AM0560 # 05 Y:2009 05 2009 REPAIR OR REPLACE STEAM TRAPS $16,000 $1,900 Implemented
AM0560 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $25,120 $2,500 Implemented
AM0560 # 03 Y:2009 03 2009 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $31,130 $70,250 Implemented
TA0068 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN WATER LINES AND VALVES $9,955 $14,400 Implemented
TA0068 # 07 Y:2004 07 2004 REPAIR AND ELIMINATE STEAM LEAKS $4,450 $420 Implemented