Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
210
matching recommendationsSIC | 202 | Dairy Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0672 # 02 Y:2016 | 02 | 2016 | INCREASE AMOUNT OF CONDENSATE RETURNED | $21,014 | $35,396 | Not Implemented |
OR0672 # 03 Y:2016 | 03 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $39,775 | $138,248 | Not Implemented |
OR0672 # 01 Y:2016 | 01 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $30,924 | $26,614 | Not Implemented |
OR0656 # 03 Y:2015 | 03 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,591 | $27,789 | Implemented |
OR0656 # 02 Y:2015 | 02 | 2015 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $188,688 | $247,000 | Implemented |
OR0656 # 01 Y:2015 | 01 | 2015 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $2,308,919 | $1,300,000 | Implemented |
OR0656 # 04 Y:2015 | 04 | 2015 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $317,386 | $0 | Not Implemented |
OR0656 # 05 Y:2015 | 05 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,282 | $22,500 | Implemented |
OR0594 # 03 Y:2012 | 03 | 2012 | Install Anaerobic Digester | $1,369,423 | $3,468,069 | Implemented |
OR0594 # 02 Y:2012 | 02 | 2012 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $163,282 | $119,416 | Not Implemented |
OR0594 # 05 Y:2012 | 05 | 2012 | INSTALL AUTOMATIC STACK DAMPER | $3,989 | $5,325 | Not Implemented |
OR0594 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,684 | $7,360 | Implemented |
OR0594 # 06 Y:2012 | 06 | 2012 | INSULATE BARE EQUIPMENT | $2,867 | $2,708 | Not Implemented |
OR0594 # 01 Y:2012 | 01 | 2012 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $393,360 | $20,880 | Not Implemented |
OR0583 # 05 Y:2012 | 05 | 2012 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,391 | $3,854 | Implemented |
OR0583 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,663 | $19,592 | Implemented |
OR0583 # 04 Y:2012 | 04 | 2012 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $6,078 | $500 | Implemented |
OR0583 # 06 Y:2012 | 06 | 2012 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $2,779 | $6,600 | Implemented |
OR0583 # 01 Y:2012 | 01 | 2012 | AVOID FROST FORMATION ON EVAPORATORS | $3,140 | $2,412 | Implemented |
OR0583 # 02 Y:2012 | 02 | 2012 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $2,994 | $10,000 | Not Implemented |
OR0559 # 06 Y:2010 | 06 | 2010 | USE HEAT EXCHANGE FLUIDS INSTEAD OF STEAM IN PIPELINE TRACING SYSTEMS | $26,673 | $64,505 | Not Implemented |
OR0559 # 05 Y:2010 | 05 | 2010 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $12,771 | $40,000 | Not Implemented |
OR0559 # 04 Y:2010 | 04 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,495 | $3,495 | Not Implemented |
OR0559 # 03 Y:2010 | 03 | 2010 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,126 | $1 | Not Implemented |
OR0559 # 02 Y:2010 | 02 | 2010 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $7,300 | $6,712 | Not Implemented |