Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,773
matching recommendationsSIC | 202 | Dairy Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0587 # 05 Y:2012 | 05 | 2012 | INSTALL OCCUPANCY SENSORS | $2,854 | $2,854 | Implemented |
OR0587 # 06 Y:2012 | 06 | 2012 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $7,810 | $9,114 | Not Implemented |
OR0587 # 07 Y:2012 | 07 | 2012 | Install Anaerobic Digester | $75,601 | $294,329 | Not Implemented |
SF0419 # 01 Y:2012 | 01 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $637 | $80 | Implemented |
SF0419 # 02 Y:2012 | 02 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,754 | $2,287 | Not Implemented |
SF0419 # 03 Y:2012 | 03 | 2012 | USE COLD WASTE WATER TO COOL CHILLER FEED WATER | $1,176 | $963 | Not Implemented |
SF0419 # 04 Y:2012 | 04 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,431 | $16,162 | Implemented |
SF0419 # 05 Y:2012 | 05 | 2012 | INSTALL AUTOMATIC BOILER FUEL FEED SYSTEM | $8,615 | $42,287 | Not Implemented |
SF0419 # 06 Y:2012 | 06 | 2012 | HEAT WATER WITH EXHAUST HEAT | $5,628 | $35,328 | Not Implemented |
SD0455 # 01 Y:2012 | 01 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $11,382 | $200 | Not Implemented |
SD0455 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,441 | $5,300 | Not Implemented |
SD0455 # 03 Y:2012 | 03 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,465 | $2,530 | Not Implemented |
SD0455 # 04 Y:2012 | 04 | 2012 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $706 | $252 | Not Implemented |
SD0455 # 05 Y:2012 | 05 | 2012 | INSTALL OCCUPANCY SENSORS | $1,808 | $1,295 | Not Implemented |
SD0455 # 06 Y:2012 | 06 | 2012 | INSULATE BARE EQUIPMENT | $5,541 | $4,213 | Not Implemented |
SD0455 # 07 Y:2012 | 07 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,146 | $3,112 | Not Implemented |
SD0455 # 08 Y:2012 | 08 | 2012 | INSULATE FEEDWATER TANK | $2,266 | $2,574 | Not Implemented |
SD0455 # 09 Y:2012 | 09 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,156 | $7,124 | Not Implemented |
SD0455 # 10 Y:2012 | 10 | 2012 | USE PHOTOCELL CONTROLS | $1,606 | $2,550 | Not Implemented |
MZ0092 # 01 Y:2012 | 01 | 2012 | REPAIR OR REPLACE STEAM TRAPS | $14,965 | $4,500 | Implemented |
MZ0092 # 02 Y:2012 | 02 | 2012 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $14,312 | $28,500 | Not Implemented |
MZ0092 # 03 Y:2012 | 03 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,594 | $1,000 | Implemented |
MZ0092 # 04 Y:2012 | 04 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $8,547 | $26,468 | Not Implemented |
MZ0092 # 05 Y:2012 | 05 | 2012 | INSULATE BARE EQUIPMENT | $6,999 | $3,738 | Implemented |
MZ0092 # 06 Y:2012 | 06 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,645 | $26,468 | Not Implemented |