IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

118

matching recommendations
Reset
SIC 202 Dairy Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0701 # 09 Y:2004 09 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,926 $0 Not Implemented
UD0701 # 10 Y:2004 10 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $5,896 $4,800 Not Implemented
UD0701 # 11 Y:2004 11 2004 REPAIR AND ELIMINATE STEAM LEAKS $5,373 $146 Not Implemented
UD0701 # 12 Y:2004 12 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,315 $16,140 Not Implemented
UD0701 # 13 Y:2004 13 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,444 $3,294 Not Implemented
UD0701 # 14 Y:2004 14 2004 DISCONNECT BALLASTS $397 $30 Not Implemented
UD0701 # 15 Y:2004 15 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $386 $174 Not Implemented
UD0701 # 16 Y:2004 16 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $261 $125 Not Implemented
UD0586 # 01 Y:2000 01 2000 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $454,896 $340,000 Not Implemented
UD0586 # 02 Y:2000 02 2000 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $99,635 $350,000 Not Implemented
UD0586 # 03 Y:2000 03 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $96,665 $5,000 Not Implemented
UD0586 # 04 Y:2000 04 2000 MINIMIZE WATER USAGE $18,654 $298 Implemented
UD0586 # 05 Y:2000 05 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,183 $0 Implemented
UD0586 # 06 Y:2000 06 2000 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,583 $0 Not Implemented
WV0109 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,527 $5,295 Implemented
WV0109 # 02 Y:1997 02 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,337 $384 Implemented
WV0109 # 03 Y:1997 03 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $616 $478 Not Implemented
WV0109 # 04 Y:1997 04 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $962 $15 Not Implemented
WV0109 # 05 Y:1997 05 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $26,265 $3,000 Implemented
WV0109 # 06 Y:1997 06 1997 DIRECT WARMEST AIR TO COMBUSTION INTAKE $7,904 $6,300 Implemented
WV0109 # 07 Y:1997 07 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $1,550 $441 Implemented
WV0109 # 08 Y:1997 08 1997 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $35,000 $5,000 Not Implemented
WV0109 # 09 Y:1997 09 1997 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $5,200 $200 Not Implemented
WV0109 # 10 Y:1997 10 1997 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $46,800 $0 Not Implemented
UD0434 # 01 Y:1994 01 1994 OPTIMIZE PLANT POWER FACTOR $4,831 $8,000 Implemented