IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,779

matching recommendations
Reset
SIC 202 Dairy Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0289 # 10 Y:2005 10 2005 PAY BILLS ON TIME TO AVOID LATE FEES $1,052 $0 Not Implemented
BD0289 # 11 Y:2005 11 2005 INSTALL AUTOMATIC PACKING EQUIPMENT $57,600 $105,000 Implemented
SU0209 # 01 Y:2005 01 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,769 $0 Implemented
SU0209 # 02 Y:2005 02 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,851 $0 Not Implemented
SU0209 # 03 Y:2005 03 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,742 $509 Implemented
SU0209 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,683 $418 Implemented
SU0209 # 05 Y:2005 05 2005 INSTALL TURBULATORS $1,988 $500 Not Implemented
SU0209 # 06 Y:2005 06 2005 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $30,000 $16,000 Implemented
SU0209 # 07 Y:2005 07 2005 USE SYNTHETIC LUBRICANT $1,072 $1,000 Implemented
SU0209 # 08 Y:2005 08 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,558 $8,908 Not Implemented
CO0559 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,070 $440 Implemented
CO0559 # 02 Y:2004 02 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $355 $416 Implemented
CO0559 # 03 Y:2004 03 2004 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,190 $740 Implemented
CO0559 # 04 Y:2004 04 2004 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $1,180 $810 Implemented
CO0559 # 05 Y:2004 05 2004 INSULATE BARE EQUIPMENT $710 $1,790 Implemented
CO0559 # 06 Y:2004 06 2004 INSTALL OCCUPANCY SENSORS $1,760 $2,260 Implemented
CO0559 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $572 $292 Implemented
CO0559 # 08 Y:2004 08 2004 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $650 $4,550 Not Implemented
OK0704 # 01 Y:2005 01 2005 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $7,257 $5,175 Not Implemented
OK0704 # 02 Y:2005 02 2005 OPERATE BOILERS ON HIGH FIRE SETTING $4,358 $1,436 Not Implemented
OK0704 # 03 Y:2005 03 2005 INSTALL OCCUPANCY SENSORS $820 $688 Not Implemented
OK0704 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,912 $8,734 Not Implemented
OK0704 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,011 $2,257 Not Implemented
OK0704 # 06 Y:2005 06 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,769 $11,310 Not Implemented
OK0704 # 07 Y:2005 07 2005 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $8,000 $0 Not Implemented