IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,731

matching recommendations
Reset
SIC 202 Dairy Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0325 # 02 Y:2003 02 2003 DIRECT WARMEST AIR TO COMBUSTION INTAKE $2,881 $2,200 Not Implemented
IA0325 # 03 Y:2003 03 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $53,817 $18,000 Implemented
IA0325 # 04 Y:2003 04 2003 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,965 $4,000 Not Implemented
IA0325 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $957 $245 Implemented
IA0325 # 06 Y:2003 06 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $508 $25 Implemented
IA0325 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,473 $11,035 Implemented
IA0325 # 08 Y:2003 08 2003 INSTALL OCCUPANCY SENSORS $53 $133 Not Implemented
IA0325 # 09 Y:2003 09 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $643 $433 Not Implemented
UU0040 # 01 Y:2003 01 2003 OPTIMIZE PLANT POWER FACTOR $1 $0 Not Implemented
UU0040 # 02 Y:2003 02 2003 UTILIZE A LESS EXPENSIVE COOLING METHOD $150 $0 Not Implemented
UU0040 # 03 Y:2003 03 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,957 $0 Not Implemented
UU0040 # 04 Y:2003 04 2003 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,285 $0 Not Implemented
UU0040 # 05 Y:2003 05 2003 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $1 $0 Not Implemented
UU0040 # 06 Y:2003 06 2003 RECOVER WASTE HEAT FROM EQUIPMENT $57 $55 Not Implemented
SD0308 # 01 Y:2002 01 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $168,158 $56,000 Not Implemented
SD0308 # 02 Y:2002 02 2002 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $7,470 $6,000 Not Implemented
SD0308 # 03 Y:2002 03 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,224 $5,000 Not Implemented
SD0308 # 04 Y:2002 04 2002 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $1,853 $0 Not Implemented
SD0308 # 05 Y:2002 05 2002 USE PHOTOCELL CONTROLS $525 $500 Not Implemented
SD0308 # 06 Y:2002 06 2002 INCREASE USE OF AUTOMATION $91,000 $75,000 Not Implemented
OR0416 # 01 Y:2002 01 2002 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $140,000 $790,000 Not Implemented
OR0416 # 02 Y:2002 02 2002 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $19,366 $0 Not Implemented
OR0416 # 03 Y:2002 03 2002 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $13,308 $0 Not Implemented
OR0416 # 04 Y:2002 04 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,862 $1,500 Not Implemented
OR0416 # 05 Y:2002 05 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $32,840 $32,942 Not Implemented