IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,779

matching recommendations
Reset
SIC 202 Dairy Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0186 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $206 $94 Implemented
MS0186 # 04 Y:2001 04 2001 INSTALL TIMERS AND/OR THERMOSTATS $228 $119 Not Implemented
MS0186 # 05 Y:2001 05 2001 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $323 $348 Not Implemented
MS0186 # 06 Y:2001 06 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,675 $8,910 Not Implemented
MS0186 # 07 Y:2001 07 2001 HEAT WATER WITH EXHAUST HEAT $12,268 $10,846 Implemented
MS0186 # 08 Y:2001 08 2001 APPLY FOR INVESTMENT INCENTIVES $74 $100 Not Implemented
SF0219 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,206 $0 Implemented
SF0219 # 02 Y:2001 02 2001 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $5,816 $5,705 Implemented
SF0219 # 03 Y:2001 03 2001 MODERATE COOLING TOWER OUTLET TEMPERATURE $415 $406 Implemented
SF0219 # 04 Y:2001 04 2001 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $529 $840 Implemented
SF0219 # 05 Y:2001 05 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,695 $11,140 Not Implemented
SF0219 # 06 Y:2001 06 2001 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $14,216 $507 Implemented
SF0217 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,715 $0 Implemented
SF0217 # 02 Y:2001 02 2001 REPAIR AND ELIMINATE STEAM LEAKS $611 $0 Implemented
SF0217 # 03 Y:2001 03 2001 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $2,551 $248 Implemented
SF0217 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,181 $3,150 Implemented
SF0217 # 05 Y:2001 05 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,600 $1,761 Implemented
SF0217 # 06 Y:2001 06 2001 INSULATE BARE EQUIPMENT $730 $1,032 Implemented
SF0217 # 07 Y:2001 07 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,141 $2,088 Not Implemented
SF0217 # 08 Y:2001 08 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,410 $15,510 Implemented
SF0217 # 09 Y:2001 09 2001 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,231 $4,000 Not Implemented
LL0106 # 01 Y:2001 01 2001 OPTIMIZE PLANT POWER FACTOR $2,493 $2,532 Implemented
LL0106 # 02 Y:2001 02 2001 INSULATE BARE EQUIPMENT $2,835 $5,442 Implemented
LL0106 # 03 Y:2001 03 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,281 $240 Implemented
LL0106 # 04 Y:2001 04 2001 ADJUST BURNERS FOR EFFICIENT OPERATION $19,278 $18,290 Implemented