IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,791

matching recommendations
Reset
SIC 202 Dairy Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0244 # 09 Y:2002 09 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $13,076 $4,000 Not Implemented
WV0244 # 10 Y:2002 10 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $13,200 $11,000 Not Implemented
AS0328 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,170 $4,422 Implemented
AS0328 # 02 Y:2002 02 2002 INSTALL OCCUPANCY SENSORS $160 $375 Not Implemented
AS0328 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $540 $675 Implemented
AS0328 # 04 Y:2002 04 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,442 $737 Implemented
AS0328 # 05 Y:2002 05 2002 INSULATE BARE EQUIPMENT $10,487 $2,091 Implemented
AS0328 # 06 Y:2002 06 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,223 $9,800 Implemented
AS0328 # 07 Y:2002 07 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $721 $1,200 Not Implemented
AS0328 # 08 Y:2002 08 2002 MINIMIZE WATER USAGE $663 $3,000 Not Implemented
MS0186 # 01 Y:2001 01 2001 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $13,374 $200 Not Implemented
MS0186 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $660 $1,415 Implemented
MS0186 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $206 $94 Implemented
MS0186 # 04 Y:2001 04 2001 INSTALL TIMERS AND/OR THERMOSTATS $228 $119 Not Implemented
MS0186 # 05 Y:2001 05 2001 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $323 $348 Not Implemented
MS0186 # 06 Y:2001 06 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,675 $8,910 Not Implemented
MS0186 # 07 Y:2001 07 2001 HEAT WATER WITH EXHAUST HEAT $12,268 $10,846 Implemented
MS0186 # 08 Y:2001 08 2001 APPLY FOR INVESTMENT INCENTIVES $74 $100 Not Implemented
SF0219 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,206 $0 Implemented
SF0219 # 02 Y:2001 02 2001 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $5,816 $5,705 Implemented
SF0219 # 03 Y:2001 03 2001 MODERATE COOLING TOWER OUTLET TEMPERATURE $415 $406 Implemented
SF0219 # 04 Y:2001 04 2001 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $529 $840 Implemented
SF0219 # 05 Y:2001 05 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,695 $11,140 Not Implemented
SF0219 # 06 Y:2001 06 2001 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $14,216 $507 Implemented
SF0217 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,715 $0 Implemented