IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,779

matching recommendations
Reset
SIC 202 Dairy Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0454 # 02 Y:1999 02 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,460 $7,500 Implemented
CO0454 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,630 $80 Implemented
CO0454 # 04 Y:1999 04 1999 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,010 $0 Implemented
CO0454 # 05 Y:1999 05 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $610 $30 Implemented
CO0454 # 06 Y:1999 06 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $392 $0 Implemented
CO0454 # 07 Y:1999 07 1999 MINIMIZE WATER USAGE $1,480 $640 Not Implemented
CO0454 # 08 Y:1999 08 1999 ELIMINATE LEAKS IN WATER LINES AND VALVES $350 $490 Implemented
IA0235 # 01 Y:1999 01 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,832 $0 Implemented
IA0235 # 02 Y:1999 02 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,453 $265 Not Implemented
IA0235 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,066 $25 Not Implemented
IA0235 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $554 $43 Implemented
IA0235 # 05 Y:1999 05 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,522 $9,183 Not Implemented
IA0235 # 06 Y:1999 06 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,864 $0 Not Implemented
IA0235 # 07 Y:1999 07 1999 INSTALL OCCUPANCY SENSORS $453 $665 Not Implemented
IA0235 # 08 Y:1999 08 1999 DIRECT WARMEST AIR TO COMBUSTION INTAKE $431 $650 Not Implemented
IA0235 # 09 Y:1999 09 1999 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $15,177 $11,511 Not Implemented
IA0235 # 10 Y:1999 10 1999 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $995 $1,046 Implemented
IA0235 # 11 Y:1999 11 1999 REUSE / RECYCLE/ SELL PAPER PRODUCTS $1,915 $100 Not Implemented
IA0235 # 12 Y:1999 12 1999 PURCHASE EQUIPMENT INSTEAD OF LEASING $2,574 $3,900 Not Implemented
KU0524 # 01 Y:1999 01 1999 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $9,520 $18,350 Implemented
KU0524 # 02 Y:1999 02 1999 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,110 $2,500 Implemented
KU0524 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,820 $3,790 Implemented
KU0524 # 04 Y:1999 04 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,070 $1,270 Implemented
KU0524 # 05 Y:1999 05 1999 INSULATE BARE EQUIPMENT $750 $680 Implemented
KU0524 # 06 Y:1999 06 1999 USE SYNTHETIC LUBRICANT $650 $1,160 Implemented