Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,779
matching recommendationsSIC | 202 | Dairy Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ME0248 # 01 Y:1998 | 01 | 1998 | INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT | $118,003 | $560,000 | Not Implemented |
ME0248 # 02 Y:1998 | 02 | 1998 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $10,099 | $0 | Implemented |
ME0248 # 03 Y:1998 | 03 | 1998 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $12,685 | $38,000 | Not Implemented |
ME0248 # 04 Y:1998 | 04 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,127 | $6,773 | Implemented |
ME0248 # 05 Y:1998 | 05 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $6,421 | $1,958 | Implemented |
ME0248 # 06 Y:1998 | 06 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,754 | $750 | Implemented |
ME0248 # 07 Y:1998 | 07 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,270 | $500 | Implemented |
ME0248 # 08 Y:1998 | 08 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,979 | $4,070 | Implemented |
ME0248 # 09 Y:1998 | 09 | 1998 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $550 | $1,900 | Implemented |
ME0248 # 10 Y:1998 | 10 | 1998 | MINIMIZE WATER USAGE | $7,418 | $12,500 | Not Implemented |
SF0143 # 01 Y:1998 | 01 | 1998 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $3,365 | $0 | Implemented |
SF0143 # 02 Y:1998 | 02 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,986 | $0 | Implemented |
SF0143 # 03 Y:1998 | 03 | 1998 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $367 | $0 | Implemented |
SF0143 # 04 Y:1998 | 04 | 1998 | USE PHOTOCELL CONTROLS | $6,026 | $2,250 | Implemented |
SF0143 # 05 Y:1998 | 05 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,067 | $4,684 | Implemented |
SF0143 # 06 Y:1998 | 06 | 1998 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $78,251 | $99,600 | Implemented |
SF0143 # 07 Y:1998 | 07 | 1998 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,701 | $9,000 | Implemented |
SF0143 # 08 Y:1998 | 08 | 1998 | INSULATE BARE EQUIPMENT | $468 | $1,138 | Implemented |
SF0143 # 09 Y:1998 | 09 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,201 | $34,990 | Not Implemented |
SF0143 # 10 Y:1998 | 10 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $687 | $2,174 | Not Implemented |
WI0325 # 01 Y:1998 | 01 | 1998 | INSTALL AUTOMATIC PACKING EQUIPMENT | $336,000 | $240,000 | Not Implemented |
WI0325 # 02 Y:1998 | 02 | 1998 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,848 | $500 | Implemented |
WI0325 # 03 Y:1998 | 03 | 1998 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,598 | $10,000 | Not Implemented |
WI0325 # 04 Y:1998 | 04 | 1998 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,590 | $0 | Not Implemented |
WI0325 # 05 Y:1998 | 05 | 1998 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $1,652 | $0 | Not Implemented |