Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
102
matching recommendationsSIC | 202 | Dairy Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0601 # 04 Y:2023 | 04 | 2023 | USE OPTIMUM THICKNESS INSULATION | $3,765 | $1,482 | Implemented |
SF0601 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,700 | $12,525 | Implemented |
SF0601 # 01 Y:2023 | 01 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $35,057 | $0 | Implemented |
SD0601 # 02 Y:2020 | 02 | 2020 | INSTALL OCCUPANCY SENSORS | $295 | $504 | Implemented |
SD0601 # 01 Y:2020 | 01 | 2020 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $714 | $1,555 | Implemented |
SD0601 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $139 | $225 | Implemented |
SD0592 # 05 Y:2020 | 05 | 2020 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,751 | $5,661 | Implemented |
SD0592 # 03 Y:2020 | 03 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,470 | $13,092 | Implemented |
SD0592 # 02 Y:2020 | 02 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $34,440 | $12,400 | Implemented |
SD0592 # 01 Y:2020 | 01 | 2020 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $61,433 | $149,300 | Implemented |
SF0520 # 02 Y:2018 | 02 | 2018 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $7,652 | $800 | Implemented |
SF0520 # 04 Y:2018 | 04 | 2018 | INSTALL / REPAIR INSULATION ON STEAM LINES | $4,469 | $4,039 | Implemented |
SF0520 # 06 Y:2018 | 06 | 2018 | INSTALL OCCUPANCY SENSORS | $942 | $900 | Implemented |
SF0520 # 07 Y:2018 | 07 | 2018 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $17,938 | $24,858 | Implemented |
SF0520 # 09 Y:2018 | 09 | 2018 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,289 | $953 | Implemented |
SF0520 # 05 Y:2018 | 05 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,296 | $8,179 | Implemented |
SF0520 # 03 Y:2018 | 03 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,563 | $136 | Implemented |
SF0519 # 06 Y:2018 | 06 | 2018 | INSULATE BARE EQUIPMENT | $9,168 | $23,469 | Implemented |
SF0516 # 05 Y:2018 | 05 | 2018 | REPAIR AND ELIMINATE STEAM LEAKS | $488 | $200 | Implemented |
SF0516 # 03 Y:2018 | 03 | 2018 | USE MINIMUM STEAM OPERATING PRESSURE | $875 | $200 | Implemented |
SF0516 # 09 Y:2018 | 09 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $43,509 | $36,186 | Implemented |
SF0516 # 02 Y:2018 | 02 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,647 | $300 | Implemented |
SF0516 # 01 Y:2018 | 01 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,768 | $350 | Implemented |
SF0516 # 08 Y:2018 | 08 | 2018 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $28,367 | $15,956 | Implemented |
SF0516 # 07 Y:2018 | 07 | 2018 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $32,827 | $20,000 | Implemented |