Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
38
matching recommendationsSIC | 202 | Dairy Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NL0087 # 08 Y:2023 | 08 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,019 | $768 | n/a |
NL0087 # 01 Y:2023 | 01 | 2023 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $491,419 | $1,990,800 | n/a |
NL0087 # 02 Y:2023 | 02 | 2023 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $254,315 | $454,461 | n/a |
NL0087 # 03 Y:2023 | 03 | 2023 | REPAIR OR REPLACE STEAM TRAPS | $17,666 | $50 | n/a |
NL0087 # 04 Y:2023 | 04 | 2023 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $12,625 | $8,000 | n/a |
NL0087 # 05 Y:2023 | 05 | 2023 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $11,616 | $7,640 | n/a |
NL0087 # 06 Y:2023 | 06 | 2023 | RECOVER AND REUSE WASTE MATERIAL | $10,817 | $3,660 | n/a |
NL0087 # 07 Y:2023 | 07 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,789 | $100 | n/a |
SF0606 # 06 Y:2023 | 06 | 2023 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $7,028 | $31,579 | Not Implemented |
SF0606 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,495 | $1,440 | Implemented |
SF0606 # 02 Y:2023 | 02 | 2023 | USE MINIMUM STEAM OPERATING PRESSURE | $5,475 | $60 | Implemented |
SF0606 # 03 Y:2023 | 03 | 2023 | INSULATE BARE EQUIPMENT | $1,107 | $564 | Implemented |
SF0606 # 07 Y:2023 | 07 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $112,666 | $923,010 | Not Implemented |
SF0606 # 04 Y:2023 | 04 | 2023 | INSULATE BARE EQUIPMENT | $5,279 | $5,910 | Implemented |
SF0606 # 05 Y:2023 | 05 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,502 | $8,173 | Implemented |
WM0203 # 06 Y:2023 | 06 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,100 | $0 | Implemented |
WM0203 # 04 Y:2023 | 04 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,070 | $1,900 | Not Implemented |
WM0203 # 02 Y:2023 | 02 | 2023 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $13,369 | $10,160 | Implemented |
WM0203 # 03 Y:2023 | 03 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,320 | $13,750 | Implemented |
WM0203 # 01 Y:2023 | 01 | 2023 | USE SYNTHETIC LUBRICANT | $16,641 | $45,000 | Implemented |
WM0203 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,171 | $17,500 | Not Implemented |
UU0223 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $277 | $142 | Implemented |
UU0223 # 02 Y:2023 | 02 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $16,735 | $51,600 | Implemented |
UU0223 # 01 Y:2023 | 01 | 2023 | ELIMINATE SHIFT | $171,281 | $5,500 | Implemented |
UU0223 # 03 Y:2023 | 03 | 2023 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $8,766 | $26,767 | Implemented |