IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

71

matching recommendations
Reset
SIC 2021 Creamery Butter
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0289 # 08 Y:2005 08 2005 USE POWER DURING OFF-PEAK PERIODS $484 $0 Implemented
BD0289 # 07 Y:2005 07 2005 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $770 $1,780 Implemented
BD0289 # 06 Y:2005 06 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $694 $900 Not Implemented
BD0289 # 05 Y:2005 05 2005 INSTALL OCCUPANCY SENSORS $910 $1,050 Implemented
BD0289 # 04 Y:2005 04 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,225 $1,500 Not Implemented
OR0479 # 03 Y:2005 03 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,710 $800 Implemented
OR0479 # 04 Y:2005 04 2005 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,500 $0 Not Implemented
OR0479 # 05 Y:2005 05 2005 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $700 $0 Not Implemented
OR0479 # 01 Y:2005 01 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $116,320 $115,000 Implemented
OR0479 # 02 Y:2005 02 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $19,750 $100 Implemented
BD0259 # 05 Y:2004 05 2004 INSTALL OCCUPANCY SENSORS $4,522 $2,700 Implemented
BD0259 # 04 Y:2004 04 2004 DIRECT WARMEST AIR TO COMBUSTION INTAKE $5,339 $2,000 Implemented
BD0259 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,350 $6,635 Implemented
BD0259 # 02 Y:2004 02 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,519 $12,700 Implemented
BD0259 # 06 Y:2004 06 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,493 $1,500 Implemented
BD0259 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,373 $9,540 Not Implemented
BD0259 # 08 Y:2004 08 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,141 $0 Implemented
BD0259 # 09 Y:2004 09 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,968 $400 Implemented
BD0259 # 10 Y:2004 10 2004 INSTALL TURBULATORS $1,916 $1,200 Not Implemented
BD0259 # 11 Y:2004 11 2004 USE PHOTOCELL CONTROLS $228 $300 Implemented
BD0259 # 12 Y:2004 12 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $211 $150 Not Implemented
BD0259 # 13 Y:2004 13 2004 INSTALL SENSORS TO DETECT AND AVOID JAMS $15,723 $3,000 Implemented
BD0259 # 01 Y:2004 01 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $31,009 $0 Implemented
DS0027 # 06 Y:1995 06 1995 INSULATE BARE EQUIPMENT $595 $77 Not Implemented
DS0027 # 07 Y:1995 07 1995 INSULATE BARE EQUIPMENT $158 $87 Not Implemented