Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
511
matching recommendationsSIC | 2022 | Cheese, Natural And Processed |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NL0087 # 05 Y:2023 | 05 | 2023 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $11,616 | $7,640 | n/a |
NL0087 # 04 Y:2023 | 04 | 2023 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $12,625 | $8,000 | n/a |
NL0087 # 07 Y:2023 | 07 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,789 | $100 | n/a |
NL0087 # 01 Y:2023 | 01 | 2023 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $491,419 | $1,990,800 | n/a |
WM0203 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,171 | $17,500 | Not Implemented |
WM0203 # 03 Y:2023 | 03 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,320 | $13,750 | Implemented |
WM0203 # 01 Y:2023 | 01 | 2023 | USE SYNTHETIC LUBRICANT | $16,641 | $45,000 | Implemented |
WM0203 # 04 Y:2023 | 04 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,070 | $1,900 | Not Implemented |
WM0203 # 02 Y:2023 | 02 | 2023 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $13,369 | $10,160 | Implemented |
WM0203 # 06 Y:2023 | 06 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,100 | $0 | Implemented |
SF0601 # 05 Y:2023 | 05 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,103 | $2,861 | Not Implemented |
SF0601 # 04 Y:2023 | 04 | 2023 | USE OPTIMUM THICKNESS INSULATION | $3,765 | $1,482 | Implemented |
SF0601 # 03 Y:2023 | 03 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $402 | $80 | Not Implemented |
SF0601 # 01 Y:2023 | 01 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $35,057 | $0 | Implemented |
SF0601 # 02 Y:2023 | 02 | 2023 | USE MINIMUM STEAM OPERATING PRESSURE | $1,168 | $200 | Not Implemented |
SF0601 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,700 | $12,525 | Implemented |
SF0601 # 07 Y:2023 | 07 | 2023 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $12,826 | $62,630 | Not Implemented |
WM0163 # 01 Y:2021 | 01 | 2021 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $17,131 | $40,000 | Not Implemented |
WM0163 # 04 Y:2021 | 04 | 2021 | USE COMPRESSOR AIR FILTERS | $3,566 | $7,132 | Not Implemented |
WM0163 # 09 Y:2021 | 09 | 2021 | INSTALL OCCUPANCY SENSORS | $1,350 | $930 | Not Implemented |
WM0163 # 08 Y:2021 | 08 | 2021 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $1,982 | $4,125 | Not Implemented |
WM0163 # 02 Y:2021 | 02 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $14,431 | $0 | Not Implemented |
WM0163 # 03 Y:2021 | 03 | 2021 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $4,101 | $3,100 | Not Implemented |
WM0163 # 07 Y:2021 | 07 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,532 | $3,750 | Not Implemented |
WM0163 # 06 Y:2021 | 06 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,848 | $2,571 | Not Implemented |