Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
40
matching recommendationsSIC | 2022 | Cheese, Natural And Processed |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0701 # 16 Y:2004 | 16 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $261 | $125 | Not Implemented |
UD0701 # 01 Y:2004 | 01 | 2004 | REDUCE OR ELIMINATE WASTE | $85,956 | $19,600 | Not Implemented |
UD0701 # 02 Y:2004 | 02 | 2004 | REDUCE EXCESSIVE BOILER BLOWDOWN | $55,242 | $1,619 | Not Implemented |
UD0701 # 03 Y:2004 | 03 | 2004 | METER WASTE WATER | $51,851 | $15,700 | Not Implemented |
UD0701 # 04 Y:2004 | 04 | 2004 | REDUCE OR ELIMINATE WASTE | $38,220 | $620 | Not Implemented |
UD0701 # 05 Y:2004 | 05 | 2004 | REDUCE VENTILATION AIR | $22,847 | $31,250 | Not Implemented |
UD0701 # 06 Y:2004 | 06 | 2004 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $8,494 | $1,500 | Not Implemented |
UD0701 # 07 Y:2004 | 07 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,577 | $16,000 | Not Implemented |
UD0701 # 08 Y:2004 | 08 | 2004 | REDUCE EXCESSIVE BOILER BLOWDOWN | $6,179 | $4,000 | Not Implemented |
UD0701 # 09 Y:2004 | 09 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,926 | $0 | Not Implemented |
UD0701 # 10 Y:2004 | 10 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $5,896 | $4,800 | Not Implemented |
UD0701 # 11 Y:2004 | 11 | 2004 | REPAIR AND ELIMINATE STEAM LEAKS | $5,373 | $146 | Not Implemented |
UD0701 # 12 Y:2004 | 12 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,315 | $16,140 | Not Implemented |
UD0701 # 13 Y:2004 | 13 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,444 | $3,294 | Not Implemented |
UD0701 # 14 Y:2004 | 14 | 2004 | DISCONNECT BALLASTS | $397 | $30 | Not Implemented |
UD0701 # 15 Y:2004 | 15 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $386 | $174 | Not Implemented |
SU0191 # 03 Y:2004 | 03 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $19,058 | $25,000 | Implemented |
SU0191 # 06 Y:2004 | 06 | 2004 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $3,000 | $7,400 | Not Implemented |
SU0191 # 05 Y:2004 | 05 | 2004 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $1,413 | $2,856 | Implemented |
SU0191 # 04 Y:2004 | 04 | 2004 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $19,254 | $38,185 | Not Implemented |
SU0191 # 02 Y:2004 | 02 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $382 | $328 | Not Implemented |
SU0191 # 01 Y:2004 | 01 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,017 | $0 | Implemented |
IC0076 # 02 Y:2004 | 02 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $13,524 | $49,376 | Implemented |
IC0076 # 01 Y:2004 | 01 | 2004 | CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS | $39,009 | $67,300 | Not Implemented |
IC0076 # 03 Y:2004 | 03 | 2004 | ISOLATE HOT OR COLD EQUIPMENT | $1,539 | $364 | Not Implemented |