IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

278

matching recommendations
Reset
SIC 2023 Dry, Condensed, Evaporated Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0621 # 06 Y:2024 06 2024 INCREASE AMOUNT OF CONDENSATE RETURNED $335,892 $109,275 n/a
SF0621 # 09 Y:2024 09 2024 INSULATE BARE EQUIPMENT $17,564 $9,294 n/a
SF0621 # 07 Y:2024 07 2024 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $6,048 $1,839 n/a
SF0621 # 08 Y:2024 08 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,248 $2,796 n/a
SF0621 # 05 Y:2024 05 2024 INSTALL STEAM TRAP $9,822 $1,988 n/a
SF0621 # 03 Y:2024 03 2024 REPAIR OR REPLACE STEAM TRAPS $6,435 $478 n/a
SF0621 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,882 $0 n/a
SF0621 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,755 $300 n/a
SF0621 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN WATER LINES AND VALVES $7,560 $700 n/a
SF0621 # 10 Y:2024 10 2024 INSTALL ISOLATION TRANSFORMER ON ADJUSTABLE FREQUENCY DRIVE $26,726 $23,394 n/a
SF0621 # 12 Y:2024 12 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $238,787 $1,065,639 n/a
SF0621 # 11 Y:2024 11 2024 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $9,426 $15,810 n/a
UW2205 # 02 Y:2022 02 2022 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $169 $838 Not Implemented
UW2205 # 03 Y:2022 03 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,984 $15,999 Implemented
UW2205 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,244 $12,938 Implemented
AS0498 # 04 Y:2021 04 2021 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $4,426 $15,525 Implemented
AS0498 # 01 Y:2021 01 2021 COMBINE UTILITY METERS $25,997 $1,473 Implemented
AS0498 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,073 $11,543 Implemented
AS0498 # 03 Y:2021 03 2021 CONTRACT A WOOD PALLET RECYCLING COMPANY $5,616 $453 Implemented
AS0498 # 05 Y:2021 05 2021 INSTALL OCCUPANCY SENSORS $2,328 $1,452 Implemented
SD0592 # 02 Y:2020 02 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $34,440 $12,400 Implemented
SD0592 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,470 $13,092 Implemented
SD0592 # 04 Y:2020 04 2020 INSTALL OCCUPANCY SENSORS $2,444 $900 Not Implemented
SD0592 # 05 Y:2020 05 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,751 $5,661 Implemented
SD0592 # 01 Y:2020 01 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $61,433 $149,300 Implemented