IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

285

matching recommendations
Reset
SIC 2023 Dry, Condensed, Evaporated Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0279 # 04 Y:2025 04 2025 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $8,900 $4,720 n/a
UU0279 # 06 Y:2025 06 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,760 $1,400 n/a
UU0279 # 01 Y:2025 01 2025 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $92,200 $14,000 n/a
UU0279 # 02 Y:2025 02 2025 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $119,920 $620,000 n/a
UU0279 # 07 Y:2025 07 2025 USE SOLAR HEAT TO MAKE ELECTRICTY $49,660 $460,010 n/a
UU0279 # 05 Y:2025 05 2025 INSULATE BARE EQUIPMENT $1,050 $2,860 n/a
UU0279 # 03 Y:2025 03 2025 REPAIR AND ELIMINATE STEAM LEAKS $5,400 $15,580 n/a
SF0621 # 03 Y:2024 03 2024 REPAIR OR REPLACE STEAM TRAPS $6,435 $478 Implemented
SF0621 # 06 Y:2024 06 2024 INCREASE AMOUNT OF CONDENSATE RETURNED $335,892 $109,275 Not Implemented
SF0621 # 05 Y:2024 05 2024 INSTALL STEAM TRAP $9,822 $1,988 Not Implemented
SF0621 # 08 Y:2024 08 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,248 $2,796 Implemented
SF0621 # 09 Y:2024 09 2024 INSULATE BARE EQUIPMENT $17,564 $9,294 Not Implemented
SF0621 # 07 Y:2024 07 2024 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $6,048 $1,839 Implemented
SF0621 # 11 Y:2024 11 2024 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $9,426 $15,810 Implemented
SF0621 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,882 $0 Implemented
SF0621 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,755 $300 Not Implemented
SF0621 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN WATER LINES AND VALVES $7,560 $700 Implemented
SF0621 # 10 Y:2024 10 2024 INSTALL ISOLATION TRANSFORMER ON ADJUSTABLE FREQUENCY DRIVE $26,726 $23,394 Not Implemented
SF0621 # 12 Y:2024 12 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $238,787 $1,065,639 Not Implemented
UW2205 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,244 $12,938 Implemented
UW2205 # 02 Y:2022 02 2022 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $169 $838 Not Implemented
UW2205 # 03 Y:2022 03 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,984 $15,999 Implemented
AS0498 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,073 $11,543 Implemented
AS0498 # 03 Y:2021 03 2021 CONTRACT A WOOD PALLET RECYCLING COMPANY $5,616 $453 Implemented
AS0498 # 04 Y:2021 04 2021 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $4,426 $15,525 Implemented