IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

278

matching recommendations
Reset
SIC 2023 Dry, Condensed, Evaporated Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0116 # 08 Y:1991 08 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $118 $305 Implemented
OR0116 # 09 Y:1991 09 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41 $0 Implemented
AM0092 # 01 Y:1990 01 1990 UPGRADE OBSOLETE EQUIPMENT $5,963 $0 Implemented
AM0092 # 02 Y:1990 02 1990 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,950 $7,000 Not Implemented
AM0092 # 03 Y:1990 03 1990 INCREASE AMOUNT OF CONDENSATE RETURNED $1,610 $30 Implemented
AM0092 # 04 Y:1990 04 1990 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,153 $2,300 Not Implemented
AM0092 # 05 Y:1990 05 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $225 $49 Implemented
AM0092 # 06 Y:1990 06 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $895 $3,850 Not Implemented
AM0092 # 07 Y:1990 07 1990 INSTALL / REPAIR INSULATION ON STEAM LINES $431 $860 Implemented
AM0092 # 08 Y:1990 08 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $143 $14 Implemented
RU0009 # 01 Y:1987 01 1987 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $4,150 $4,392 Not Implemented
RU0009 # 02 Y:1987 02 1987 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $410 $125 Not Implemented
RU0009 # 03 Y:1987 03 1987 IMPROVE LUBRICATION PRACTICES $1,609 $1,600 Implemented
RU0009 # 04 Y:1987 04 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,243 $0 Implemented
RU0009 # 05 Y:1987 05 1987 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $140 $300 Not Implemented
RU0009 # 06 Y:1987 06 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,540 $279 Implemented
MA0022 # 01 Y:1985 01 1985 HEAT WATER WITH EXHAUST HEAT $2,163 $1,875 Not Implemented
MA0022 # 02 Y:1985 02 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $753 $1,827 Implemented
MA0022 # 03 Y:1985 03 1985 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $160 $154 Implemented
MA0022 # 04 Y:1985 04 1985 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $283 $0 Implemented
MA0022 # 05 Y:1985 05 1985 OPTIMIZE PLANT POWER FACTOR $432 $289 Implemented
MA0022 # 06 Y:1985 06 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,060 $1,190 Not Implemented
TN0146 # 01 Y:1982 01 1982 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $32,767 $35,000 Not Implemented
TN0146 # 02 Y:1982 02 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $19,172 $2,000 Not Implemented
TN0146 # 03 Y:1982 03 1982 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $9,986 $15,000 Not Implemented