IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

278

matching recommendations
Reset
SIC 2023 Dry, Condensed, Evaporated Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0244 # 01 Y:1999 01 1999 INSTALL OCCUPANCY SENSORS $522 $1,800 n/a
AS0244 # 02 Y:1999 02 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,441 $9,669 n/a
AS0244 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $16,388 $120 n/a
AS0244 # 04 Y:1999 04 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $15,768 $480 n/a
AS0244 # 05 Y:1999 05 1999 PURCHASE EQUIPMENT INSTEAD OF LEASING $14,400 $50,000 n/a
AS0244 # 06 Y:1999 06 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $346,891 $10,000 n/a
MO0227 # 01 Y:1998 01 1998 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $3,155 $3,700 Not Implemented
MO0227 # 02 Y:1998 02 1998 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $4,071 $9,000 Not Implemented
MO0227 # 03 Y:1998 03 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,132 $6,768 Implemented
MO0227 # 04 Y:1998 04 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $164 $276 Implemented
MO0227 # 05 Y:1998 05 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,109 $139 Implemented
MO0227 # 06 Y:1998 06 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,138 $13,876 Implemented
MO0227 # 07 Y:1998 07 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $469 $0 Implemented
MO0227 # 08 Y:1998 08 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $388,472 $100,000 Not Implemented
MO0227 # 09 Y:1998 09 1998 USE PLASTIC PALLETS INSTEAD OF WOOD $64,000 $31,500 Not Implemented
OR0281 # 01 Y:1996 01 1996 KEEP BOILER TUBES CLEAN $10,640 $800 Implemented
OR0281 # 02 Y:1996 02 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,000 $128,480 Implemented
OR0281 # 03 Y:1996 03 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $16,450 $34,810 Implemented
OR0281 # 04 Y:1996 04 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,510 $11,180 Implemented
OR0281 # 05 Y:1996 05 1996 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $7,790 $2,000 Not Implemented
OR0281 # 06 Y:1996 06 1996 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $2,770 $5,000 Not Implemented
OR0281 # 07 Y:1996 07 1996 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $10,430 $50,000 Implemented
OR0281 # 08 Y:1996 08 1996 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $120 $0 Implemented
AS0190 # 01 Y:1996 01 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,769 $100 Implemented
AS0190 # 02 Y:1996 02 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,298 $440 Implemented