IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20

matching recommendations
Reset
SIC 2024 Ice Cream And Frozen Desserts
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0223 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $277 $142 Implemented
UU0223 # 04 Y:2023 04 2023 INCREASE AMOUNT OF CONDENSATE RETURNED $3,305 $11,743 Implemented
UU0223 # 03 Y:2023 03 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $8,766 $26,767 Implemented
UU0223 # 02 Y:2023 02 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $16,735 $51,600 Implemented
UU0223 # 01 Y:2023 01 2023 ELIMINATE SHIFT $171,281 $5,500 Implemented
UU0161 # 06 Y:2020 06 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,780 $6,880 Implemented
UU0161 # 03 Y:2020 03 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,315 $7,880 Implemented
UU0161 # 02 Y:2020 02 2020 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $22,840 $53,000 Implemented
UU0161 # 01 Y:2020 01 2020 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $43,260 $86,000 Implemented
AM0654 # 02 Y:2014 02 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,950 $1,320 Implemented
AM0654 # 08 Y:2014 08 2014 INSTALL OCCUPANCY SENSORS $217 $400 Implemented
AM0654 # 07 Y:2014 07 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $677 $5 Implemented
AM0654 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $724 $576 Implemented
AM0654 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,476 $1,000 Implemented
AM0654 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,492 $3,750 Implemented
AM0654 # 01 Y:2014 01 2014 OPTIMIZE PLANT POWER FACTOR $6,620 $9,320 Implemented
UU0095 # 01 Y:2005 01 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,360 $2,000 Implemented
UU0057 # 10 Y:2004 10 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $398 $20 Implemented
UU0057 # 09 Y:2004 09 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,920 $0 Implemented
UU0057 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $792 $100 Implemented