Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
512
matching recommendationsSIC | 2024 | Ice Cream And Frozen Desserts |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0272 # 03 Y:2005 | 03 | 2005 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,631 | $300 | Implemented |
UM0272 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,459 | $5,009 | Not Implemented |
GT0780 # 01 Y:2004 | 01 | 2004 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $6,020 | $11,903 | Implemented |
GT0780 # 02 Y:2004 | 02 | 2004 | INSTALL TURBULATORS | $11,482 | $12,800 | n/a |
GT0780 # 03 Y:2004 | 03 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,654 | $10,261 | Implemented |
GT0780 # 04 Y:2004 | 04 | 2004 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $25,046 | $92,125 | Not Implemented |
GT0780 # 05 Y:2004 | 05 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,772 | $500 | Implemented |
GT0780 # 06 Y:2004 | 06 | 2004 | COMBINE UTILITY METERS | $23,320 | $0 | Not Implemented |
GT0780 # 07 Y:2004 | 07 | 2004 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,729 | $1,209 | Implemented |
GT0780 # 08 Y:2004 | 08 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,512 | $0 | Not Implemented |
GT0780 # 09 Y:2004 | 09 | 2004 | REPAIR AND ELIMINATE STEAM LEAKS | $7,453 | $900 | Implemented |
GT0780 # 10 Y:2004 | 10 | 2004 | CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS | $12,344 | $20,000 | Not Implemented |
GT0780 # 11 Y:2004 | 11 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,325 | $1,600 | Not Implemented |
GT0780 # 12 Y:2004 | 12 | 2004 | CONTROL PRESSURE ON STEAMER OPERATIONS | $2,490 | $800 | Implemented |
TA0068 # 01 Y:2004 | 01 | 2004 | REDUCE SCRAP PRODUCTION | $400,000 | $8,000 | Implemented |
TA0068 # 02 Y:2004 | 02 | 2004 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $82,002 | $12,000 | Implemented |
TA0068 # 03 Y:2004 | 03 | 2004 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $32,648 | $6,515 | Not Implemented |
TA0068 # 04 Y:2004 | 04 | 2004 | MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT | $31,311 | $62,000 | Not Implemented |
TA0068 # 05 Y:2004 | 05 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $13,130 | $3,258 | Implemented |
TA0068 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $9,955 | $14,400 | Implemented |
TA0068 # 07 Y:2004 | 07 | 2004 | REPAIR AND ELIMINATE STEAM LEAKS | $4,450 | $420 | Implemented |
TA0068 # 08 Y:2004 | 08 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,017 | $126 | Implemented |
UU0057 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $792 | $100 | Implemented |
UU0057 # 02 Y:2004 | 02 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $829 | $20 | Not Implemented |
UU0057 # 03 Y:2004 | 03 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $279 | $129 | Not Implemented |