IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

497

matching recommendations
Reset
SIC 2024 Ice Cream And Frozen Desserts
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0052 # 06 Y:1986 06 1986 IMPROVE LUBRICATION PRACTICES $3,842 $0 Implemented
CO0052 # 07 Y:1986 07 1986 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $111 $250 Not Implemented
CO0052 # 08 Y:1986 08 1986 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $73 $30 Implemented
CO0052 # 09 Y:1986 09 1986 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $3,902 $4,000 Implemented
CO0052 # 10 Y:1986 10 1986 INSTALL SET-BACK TIMERS $1,267 $657 Implemented
UD0180 # 01 Y:1985 01 1985 REDESIGN PROCESS $5,475 $0 Implemented
UD0180 # 02 Y:1985 02 1985 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $2,995 $10,000 Implemented
UD0180 # 03 Y:1985 03 1985 REPAIR OR REPLACE STEAM TRAPS $1,559 $2,500 Implemented
UD0180 # 04 Y:1985 04 1985 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,008 $4,000 Implemented
UD0180 # 05 Y:1985 05 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $657 $700 Implemented
UD0180 # 06 Y:1985 06 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,822 $0 Not Implemented
OK0181 # 01 Y:1985 01 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,786 $4,300 Not Implemented
OK0181 # 02 Y:1985 02 1985 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,120 $6,500 Not Implemented
OK0181 # 03 Y:1985 03 1985 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $3,832 $2,940 Not Implemented
OK0181 # 04 Y:1985 04 1985 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $1,131 $579 Not Implemented
OK0181 # 05 Y:1985 05 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $649 $592 Implemented
OK0181 # 06 Y:1985 06 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,428 $57 Implemented
KU0165 # 01 Y:1985 01 1985 INCREASE AMOUNT OF CONDENSATE RETURNED $28,837 $33,000 Implemented
KU0165 # 02 Y:1985 02 1985 HEAT WATER WITH EXHAUST HEAT $20,949 $37,000 Implemented
KU0165 # 03 Y:1985 03 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $16,822 $9,000 Not Implemented
KU0165 # 04 Y:1985 04 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,248 $4,815 Implemented
KU0165 # 05 Y:1985 05 1985 IMPROVE LUBRICATION PRACTICES $10,224 $8,000 Implemented
KU0165 # 06 Y:1985 06 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,321 $1,020 Implemented
KU0165 # 07 Y:1985 07 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,984 $50 Implemented
KU0165 # 08 Y:1985 08 1985 RECOVER WASTE HEAT FROM EQUIPMENT $998 $450 Implemented