Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
497
matching recommendationsSIC | 2024 | Ice Cream And Frozen Desserts |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0092 # 06 Y:2012 | 06 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,645 | $26,468 | Not Implemented |
MZ0092 # 05 Y:2012 | 05 | 2012 | INSULATE BARE EQUIPMENT | $6,999 | $3,738 | Implemented |
MZ0092 # 04 Y:2012 | 04 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $8,547 | $26,468 | Not Implemented |
MZ0092 # 03 Y:2012 | 03 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,594 | $1,000 | Implemented |
MZ0092 # 02 Y:2012 | 02 | 2012 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $14,312 | $28,500 | Not Implemented |
MZ0092 # 01 Y:2012 | 01 | 2012 | REPAIR OR REPLACE STEAM TRAPS | $14,965 | $4,500 | Implemented |
LE0290 # 12 Y:2009 | 12 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $990 | $2,500 | Implemented |
LE0290 # 11 Y:2009 | 11 | 2009 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $900 | $1,500 | Not Implemented |
LE0290 # 10 Y:2009 | 10 | 2009 | INSTALL OCCUPANCY SENSORS | $1,045 | $0 | Implemented |
LE0290 # 09 Y:2009 | 09 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,150 | $2,500 | Implemented |
LE0290 # 08 Y:2009 | 08 | 2009 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $1,204 | $2,500 | Implemented |
LE0290 # 07 Y:2009 | 07 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,267 | $0 | Implemented |
LE0290 # 06 Y:2009 | 06 | 2009 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $1,400 | $500 | Not Implemented |
LE0290 # 05 Y:2009 | 05 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,148 | $152 | Not Implemented |
LE0290 # 04 Y:2009 | 04 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,543 | $750 | Implemented |
LE0290 # 03 Y:2009 | 03 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,929 | $2,000 | Not Implemented |
LE0290 # 02 Y:2009 | 02 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,837 | $15,700 | Not Implemented |
LE0290 # 01 Y:2009 | 01 | 2009 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $9,385 | $1,200 | Not Implemented |
MA0603 # 01 Y:2006 | 01 | 2006 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $715,984 | $3,400,000 | Not Implemented |
MA0603 # 02 Y:2006 | 02 | 2006 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $54,146 | $2,000 | Implemented |
MA0603 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $41,920 | $83,405 | Implemented |
MA0603 # 04 Y:2006 | 04 | 2006 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $34,778 | $8,125 | Implemented |
MA0603 # 05 Y:2006 | 05 | 2006 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $26,243 | $30,600 | Not Implemented |
MA0603 # 06 Y:2006 | 06 | 2006 | USE UTILITY CONTROLLED POWER MANAGEMENT | $24,068 | $0 | Not Implemented |
MA0603 # 07 Y:2006 | 07 | 2006 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $16,595 | $83,500 | Implemented |