IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
Reset
SIC 2024 Ice Cream And Frozen Desserts
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0643 # 08 Y:2013 08 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $307 $157 Not Implemented
AM0643 # 07 Y:2013 07 2013 USE SYNTHETIC LUBRICANT $1,887 $0 Not Implemented
AM0643 # 06 Y:2013 06 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,960 $500 Implemented
AM0643 # 05 Y:2013 05 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,900 $500 Implemented
AM0643 # 04 Y:2013 04 2013 INSULATE BARE EQUIPMENT $1,940 $235 Implemented
AM0643 # 09 Y:2013 09 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $250 $126 Not Implemented
AM0643 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $2,700 $1,800 Not Implemented
AM0643 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,370 $50 Implemented
AM0643 # 01 Y:2013 01 2013 INCREASE AMOUNT OF CONDENSATE RETURNED $34,060 $250,000 Implemented
TA0068 # 05 Y:2004 05 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $13,130 $3,258 Implemented
TA0068 # 08 Y:2004 08 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,017 $126 Implemented
TA0068 # 07 Y:2004 07 2004 REPAIR AND ELIMINATE STEAM LEAKS $4,450 $420 Implemented
TA0068 # 04 Y:2004 04 2004 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $31,311 $62,000 Not Implemented
TA0068 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN WATER LINES AND VALVES $9,955 $14,400 Implemented
TA0068 # 01 Y:2004 01 2004 REDUCE SCRAP PRODUCTION $400,000 $8,000 Implemented
TA0068 # 03 Y:2004 03 2004 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $32,648 $6,515 Not Implemented
TA0068 # 02 Y:2004 02 2004 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $82,002 $12,000 Implemented
AM0283 # 01 Y:1996 01 1996 OPTIMIZE PLANT POWER FACTOR $43,960 $40,000 Implemented
AM0283 # 02 Y:1996 02 1996 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,860 $500 Implemented
AM0283 # 03 Y:1996 03 1996 INSTALL / REPAIR INSULATION ON STEAM LINES $1,940 $4,320 Implemented
AM0283 # 04 Y:1996 04 1996 REPAIR AND ELIMINATE STEAM LEAKS $1,570 $100 Implemented
AM0283 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,140 $1,180 Not Implemented
AM0283 # 06 Y:1996 06 1996 ELIMINATE LEAKS IN WATER LINES AND VALVES $5,900 $100 Implemented
AM0283 # 07 Y:1996 07 1996 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $2,070 $0 Implemented
AM0230 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $190 $66 Implemented