IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,375

matching recommendations
Reset
SIC 2026 Fluid Milk
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0443 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $38,731 $42,492 Implemented
UF0443 # 03 Y:2011 03 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $9,454 $38,200 Not Implemented
UF0443 # 04 Y:2011 04 2011 AIR CONDITION ONLY SPACE NECESSARY $4,722 $550 Not Implemented
UF0443 # 05 Y:2011 05 2011 INSTALL TIMERS AND/OR THERMOSTATS $562 $75 Implemented
UF0443 # 06 Y:2011 06 2011 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $19,349 $2,235 Implemented
UF0443 # 07 Y:2011 07 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $106,353 $25,300 Not Implemented
UF0443 # 08 Y:2011 08 2011 REPAIR AND ELIMINATE STEAM LEAKS $156 $370 Not Implemented
UF0443 # 09 Y:2011 09 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $80,522 $8,600 Not Implemented
UF0443 # 10 Y:2011 10 2011 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $4,822 $670 Not Implemented
UD0836 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,705 $2,196 Not Implemented
UD0836 # 02 Y:2011 02 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,796 $36 Not Implemented
UD0836 # 03 Y:2011 03 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,689 $7,000 Not Implemented
UD0836 # 04 Y:2011 04 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $37,847 $32,000 Not Implemented
UD0836 # 05 Y:2011 05 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,178 $1,000 Not Implemented
UD0836 # 06 Y:2011 06 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $1,960 $1,140 Not Implemented
UD0836 # 07 Y:2011 07 2011 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $12,875 $15,000 Not Implemented
UD0836 # 08 Y:2011 08 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $30,572 $99,100 Not Implemented
UD0836 # 09 Y:2011 09 2011 RECOVER WASTE HEAT FROM EQUIPMENT $25,293 $18,000 Not Implemented
UD0836 # 10 Y:2011 10 2011 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $6,389 $10,000 Not Implemented
SF0394 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,204 $73 Implemented
SF0394 # 02 Y:2011 02 2011 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $439 $235 Implemented
SF0394 # 03 Y:2011 03 2011 OPTIMIZE PLANT POWER FACTOR $2,952 $3,821 Implemented
SF0394 # 04 Y:2011 04 2011 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $2,879 $3,638 Implemented
SF0394 # 05 Y:2011 05 2011 INSTALL OCCUPANCY SENSORS $7,621 $11,002 Implemented
SF0394 # 06 Y:2011 06 2011 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $7,794 $20,780 Implemented