IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,375

matching recommendations
Reset
SIC 2026 Fluid Milk
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0394 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $241 $700 Implemented
SF0394 # 08 Y:2011 08 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,002 $12,392 Not Implemented
SF0393 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,408 $720 Implemented
SF0393 # 02 Y:2011 02 2011 RECOVER WASTE HEAT FROM EQUIPMENT $99,396 $33,822 Implemented
SF0393 # 03 Y:2011 03 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,385 $4,330 Implemented
SF0393 # 04 Y:2011 04 2011 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,791 $1,329 Not Implemented
SF0393 # 05 Y:2011 05 2011 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $153,800 $220,659 Not Implemented
SF0393 # 06 Y:2011 06 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,218 $19,157 Not Implemented
SF0393 # 07 Y:2011 07 2011 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $32,171 $34,310 Implemented
SF0393 # 08 Y:2011 08 2011 INSULATE BARE EQUIPMENT $6,132 $17,178 Implemented
SF0393 # 09 Y:2011 09 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,350 $25,921 Implemented
SF0393 # 10 Y:2011 10 2011 INSTALL OCCUPANCY SENSORS $3,016 $14,478 Implemented
LE0309 # 01 Y:2010 01 2010 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $189,768 $90,000 Not Implemented
LE0309 # 02 Y:2010 02 2010 INSULATE BARE EQUIPMENT $23,403 $5,772 Implemented
LE0309 # 03 Y:2010 03 2010 INSTALL TIMERS AND/OR THERMOSTATS $21,770 $250 Implemented
LE0309 # 04 Y:2010 04 2010 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $16,145 $20,000 Not Implemented
LE0309 # 05 Y:2010 05 2010 PREHEAT COMBUSTION AIR WITH WASTE HEAT $11,117 $30,000 Not Implemented
LE0309 # 06 Y:2010 06 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,925 $0 Implemented
LE0309 # 07 Y:2010 07 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,657 $1,000 Implemented
LE0309 # 08 Y:2010 08 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,494 $40 Implemented
LE0309 # 09 Y:2010 09 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,018 $2,431 Implemented
UF0412 # 01 Y:2008 01 2008 INSTALL OCCUPANCY SENSORS $207 $79 Not Implemented
UF0412 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,683 $42,414 Implemented
UF0412 # 03 Y:2008 03 2008 UPGRADE CONTROLS ON COMPRESSORS $12,505 $731 Implemented
UF0412 # 04 Y:2008 04 2008 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $1,855 $795 Not Implemented