Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,381
matching recommendationsSIC | 2026 | Fluid Milk |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0375 # 02 Y:2000 | 02 | 2000 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,590 | $500 | Implemented |
AM0375 # 03 Y:2000 | 03 | 2000 | OPTIMIZE PLANT POWER FACTOR | $5,500 | $10,990 | Implemented |
AM0375 # 04 Y:2000 | 04 | 2000 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $2,180 | $300 | Implemented |
AM0375 # 05 Y:2000 | 05 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,390 | $720 | Implemented |
AM0375 # 06 Y:2000 | 06 | 2000 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,060 | $0 | Not Implemented |
AM0375 # 07 Y:2000 | 07 | 2000 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $835 | $0 | Implemented |
AM0375 # 08 Y:2000 | 08 | 2000 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $500 | $1,060 | Implemented |
AM0375 # 09 Y:2000 | 09 | 2000 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $300 | $0 | Implemented |
MA0458 # 01 Y:2000 | 01 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,269 | $64,000 | Not Implemented |
MA0458 # 02 Y:2000 | 02 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,885 | $6,215 | Implemented |
MA0458 # 03 Y:2000 | 03 | 2000 | INSTALL OCCUPANCY SENSORS | $1,161 | $600 | Implemented |
MA0458 # 04 Y:2000 | 04 | 2000 | INSTALL / REPAIR INSULATION ON STEAM LINES | $963 | $400 | Implemented |
MA0458 # 05 Y:2000 | 05 | 2000 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $757 | $1,000 | Implemented |
UD0586 # 01 Y:2000 | 01 | 2000 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $454,896 | $340,000 | Not Implemented |
UD0586 # 02 Y:2000 | 02 | 2000 | MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT | $99,635 | $350,000 | Not Implemented |
UD0586 # 03 Y:2000 | 03 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $96,665 | $5,000 | Not Implemented |
UD0586 # 04 Y:2000 | 04 | 2000 | MINIMIZE WATER USAGE | $18,654 | $298 | Implemented |
UD0586 # 05 Y:2000 | 05 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,183 | $0 | Implemented |
UD0586 # 06 Y:2000 | 06 | 2000 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,583 | $0 | Not Implemented |
AR0177 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,480 | $1,214 | Not Implemented |
AR0177 # 02 Y:1999 | 02 | 1999 | INSTALL / REPAIR INSULATION ON STEAM LINES | $5,452 | $6,656 | Not Implemented |
AR0177 # 03 Y:1999 | 03 | 1999 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $48,768 | $92,500 | Not Implemented |
AR0177 # 04 Y:1999 | 04 | 1999 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $5,480 | $8,000 | Not Implemented |
AR0177 # 05 Y:1999 | 05 | 1999 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $384,000 | $400,000 | Not Implemented |
IA0235 # 01 Y:1999 | 01 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,832 | $0 | Implemented |