Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,378
matching recommendationsSIC | 203 | Preserved Fruits And Vegetables |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0256 # 07 Y:2003 | 07 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $267 | $750 | Implemented |
WV0256 # 08 Y:2003 | 08 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $255 | $0 | Implemented |
WV0256 # 09 Y:2003 | 09 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $752 | $40 | Implemented |
WV0256 # 10 Y:2003 | 10 | 2003 | REPAIR AND ELIMINATE STEAM LEAKS | $1,043 | $1,000 | Implemented |
SU0148 # 02 Y:2002 | 02 | 2002 | ADJUST BURNERS FOR EFFICIENT OPERATION | $25,533 | $0 | Implemented |
SU0148 # 03 Y:2002 | 03 | 2002 | MODIFY WORKLOAD | $14,400 | $20,000 | Implemented |
SU0148 # 04 Y:2002 | 04 | 2002 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $31,584 | $17,490 | Implemented |
SU0148 # 05 Y:2002 | 05 | 2002 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $9,006 | $3,700 | Implemented |
SU0148 # 07 Y:2002 | 07 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $105 | $0 | Implemented |
SU0148 # 08 Y:2002 | 08 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $70 | $60 | Implemented |
OR0422 # 01 Y:2002 | 01 | 2002 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,067 | $0 | Implemented |
OR0422 # 02 Y:2002 | 02 | 2002 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $4,106 | $2,000 | Implemented |
OR0422 # 03 Y:2002 | 03 | 2002 | USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | $6,975 | $5,500 | Implemented |
OR0422 # 04 Y:2002 | 04 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,944 | $2,953 | Implemented |
OR0422 # 05 Y:2002 | 05 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $595 | $0 | Implemented |
SF0244 # 02 Y:2002 | 02 | 2002 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $107,810 | $50,000 | Implemented |
SF0244 # 04 Y:2002 | 04 | 2002 | REDUCE FLUID FLOW RATES | $31,494 | $16,627 | Implemented |
SF0244 # 06 Y:2002 | 06 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,304 | $4,110 | Implemented |
SF0244 # 07 Y:2002 | 07 | 2002 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $21,274 | $17,580 | Implemented |
SF0244 # 08 Y:2002 | 08 | 2002 | REDUCE EXCESSIVE BOILER BLOWDOWN | $6,671 | $6,000 | Implemented |
SF0244 # 16 Y:2002 | 16 | 2002 | INSTALL AUTOMATIC PACKING EQUIPMENT | $101,519 | $350,000 | Implemented |
LL0139 # 01 Y:2002 | 01 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,787 | $435 | Implemented |
LL0139 # 06 Y:2002 | 06 | 2002 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $9,786 | $0 | Implemented |
LL0139 # 07 Y:2002 | 07 | 2002 | PAY UTILITY BILLS ON TIME | $945 | $0 | Implemented |
LM0036 # 01 Y:2002 | 01 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $203,445 | $95,480 | Implemented |