IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

38

matching recommendations
Reset
SIC 203 Preserved Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1010 # 10 Y:2020 10 2020 REDESIGN PROCESS $3,722 $43,500 Implemented
UD1010 # 06 Y:2020 06 2020 REPAIR OR REPLACE STEAM TRAPS $483 $5,500 Implemented
UD1010 # 05 Y:2020 05 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,001 $60,000 Implemented
UD1010 # 01 Y:2020 01 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,598 $500 Implemented
UD1010 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $299 $0 Implemented
UD0839 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,985 $5,668 Implemented
UD0839 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $58,395 $500 Implemented
UD0839 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,472 $0 Implemented
UD0839 # 09 Y:2011 09 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,418 $3,000 Implemented
UD0839 # 10 Y:2011 10 2011 OPERATE BOILERS ON HIGH FIRE SETTING $11,810 $23,620 Implemented
UD0839 # 11 Y:2011 11 2011 REPAIR AND ELIMINATE STEAM LEAKS $5,425 $2,100 Implemented
UD0839 # 12 Y:2011 12 2011 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $1,987 $993 Implemented
UD0839 # 13 Y:2011 13 2011 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $48,911 $75,000 Implemented
WV0256 # 03 Y:2003 03 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $82 $1,000 Implemented
WV0256 # 10 Y:2003 10 2003 REPAIR AND ELIMINATE STEAM LEAKS $1,043 $1,000 Implemented
WV0256 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $541 $50 Implemented
WV0256 # 07 Y:2003 07 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $267 $750 Implemented
WV0256 # 08 Y:2003 08 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $255 $0 Implemented
WV0256 # 09 Y:2003 09 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $752 $40 Implemented
WV0256 # 02 Y:2003 02 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,359 $400 Implemented
WV0256 # 01 Y:2003 01 2003 INSULATE BARE EQUIPMENT $969 $1,023 Implemented
UD0578 # 01 Y:1999 01 1999 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $323,997 $26,940 Implemented
UD0578 # 03 Y:1999 03 1999 INSTALL EQUIPMENT TO MOVE PRODUCT $19,500 $8,600 Implemented
UD0578 # 06 Y:1999 06 1999 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $5,242 $0 Implemented
UD0578 # 04 Y:1999 04 1999 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $17,671 $3,000 Implemented