Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
251
matching recommendationsSIC | 203 | Preserved Fruits And Vegetables |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0225 # 09 Y:2012 | 09 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,598 | $80 | Implemented |
MI0225 # 08 Y:2012 | 08 | 2012 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $2,502 | $2,372 | Not Implemented |
MI0225 # 07 Y:2012 | 07 | 2012 | HEAT WATER WITH EXHAUST HEAT | $5,925 | $8,000 | Not Implemented |
MI0225 # 06 Y:2012 | 06 | 2012 | USE POWER DURING OFF-PEAK PERIODS | $11,955 | $800 | Not Implemented |
MI0225 # 05 Y:2012 | 05 | 2012 | INSTALL OCCUPANCY SENSORS | $13,619 | $520 | Implemented |
MI0225 # 03 Y:2012 | 03 | 2012 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $27,049 | $190,339 | Implemented |
MI0225 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $29,492 | $29,008 | Not Implemented |
MI0225 # 01 Y:2012 | 01 | 2012 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $114,097 | $23,031 | Implemented |
MI0211 # 09 Y:2011 | 09 | 2011 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,438 | $4,571 | Implemented |
MI0211 # 08 Y:2011 | 08 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,475 | $1,720 | Not Implemented |
MI0211 # 07 Y:2011 | 07 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,618 | $50 | Implemented |
MI0211 # 06 Y:2011 | 06 | 2011 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,771 | $1,950 | Implemented |
MI0211 # 05 Y:2011 | 05 | 2011 | HEAT WATER WITH EXHAUST HEAT | $16,479 | $30,000 | Not Implemented |
MI0211 # 04 Y:2011 | 04 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $22,111 | $1,320 | Implemented |
MI0211 # 03 Y:2011 | 03 | 2011 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $24,390 | $25,000 | Not Implemented |
MI0211 # 02 Y:2011 | 02 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $25,191 | $41,400 | Implemented |
MI0211 # 01 Y:2011 | 01 | 2011 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $25,532 | $213,119 | Implemented |
MI0210 # 09 Y:2011 | 09 | 2011 | HEAT WATER WITH EXHAUST HEAT | $16,131 | $30,000 | Not Implemented |
MI0210 # 01 Y:2011 | 01 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $64,568 | $175,700 | Not Implemented |
MI0210 # 02 Y:2011 | 02 | 2011 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $39,559 | $7,338 | Not Implemented |
MI0210 # 03 Y:2011 | 03 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $24,805 | $1,320 | Implemented |
MI0210 # 04 Y:2011 | 04 | 2011 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $20,342 | $1,350 | Not Implemented |
MI0210 # 05 Y:2011 | 05 | 2011 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $18,730 | $26,000 | Implemented |
MI0210 # 06 Y:2011 | 06 | 2011 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $18,125 | $133,000 | Implemented |
MI0210 # 08 Y:2011 | 08 | 2011 | INSTALL / REPAIR INSULATION ON STEAM LINES | $16,463 | $16,554 | Not Implemented |